Code | One | Description | Amount | Price (€) | Amount (€) | Impact of labor (€) | Labor (h) | Impact of labor (%) |
RE0354 | m | Saniado and repair in front of forging, song of 30 cm. | 1,00 | 19,90 | 19,90 | 13,26 | 0,81 | 66,63 |
| | Sanoado and repair of the forged fronts on the outer facades and open the roof of the balcony these coatings, with mechanical or manual means until at least the oxidation of which the chip causes. A cleaning of oxides of this armor will be performed throughout its extension and contour for Brush Puas, with the subsequent application of the accession and the mortar of protection of the armor with a panel of the Sika Monotop 910 brand or Similar, in two layers and regeneration, even reconstructs the original form of the piece to be repaired, with a mortar based on cement and synthetic resins, silica smoke and polypropylene fibers of the Sika Monotop 612 or a brand. Similar, even P.P. Auxiliary supports, elimination of excess material and waste load, not including transportation to the authorized landfill; Fully prepared for the rear graffiti, not included in this element. Given a 30 cm visting forged song. | | | | | | |
%01a | % | Auxiliary costs on the labor | 0,02 | | 0,27 | | | |
%02 | % | Indirect costs | 0,03 | | 0,57 | | | |
| % | Estimation of the degree of difficulty or uncertainty (normal: 1.00) | 1,00 | | | | | |
REU0264 | u | Hilti / Kango Electric Hammer electric. | 0,10 | 16,00 | 1,60 | | | |
REU0145 | kg | SIKA CORROSION INHIBITOR AMBATEC Top 110-Epocem and Union Bridge, 4kg Boat, 3 components: A+B+C. | 0,15 | 4,15 | 0,62 | | | |
REU0031 | kg | Mortar of structural resins, R4 applied product, in bags of 25 kg. | 5,50 | 0,65 | 3,58 | | | |
MOU0005 | h | 1st officer under construction. Professional level VIII (Source: IVE). / More information | 0,46 | 17,93 | 8,25 | 8,25 | 0,46 | |
MOU0006 | h | Ordinary pawn under construction. Professional level XII (Source: IVE). / More information | 0,35 | 14,31 | 5,01 | 5,01 | 0,35 | |
| | Remarks: | | | | | | |
| | Consider the picado of the solo researcher in the area in poor state and the timely repair of the hormigón of 20% of the surface each ml. | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Written by Vicente Almudéver | | | | | | |
| | | | | | | | |
| | Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Update 27/11/2013 | | | | | | |
| | Zone València | | | | | | |
| | Remarks: Notes de l'autor? | | | | | | |
| | .......... | | | | | | |
| | Validated by ? | | | | | | |
| | Profile ? | | | | | | |
| | Validated by date 00/00/0000 | | | | | | |
| | Remarks: Notes del validador? | | | | | | |
| | edit price | | | | | | |
|