Code | One | Description | Amount | Price (€) | Amount (€) | Impact of labor (€) | Labor (h) | Impact of labor (%) |
RE0361 | m² | False ceiling of the plate plate 15 mm, with auxiliary structure. | 1,00 | 36,59 | 36,59 | 7,09 | 0,42 | 19,38 |
| | False continuous ceiling formed with a gypsum board of 15 mm, with a tuned edge, in a longitudinal structure of the teacher 60x27x4 mm and transverse parts of the same profile and following the tracks of the covers, anchor with a rod hanging, even proportional part. of the pieces of pieces of pieces of pieces of the pieces of hanging, leveling, trigger and joint treatment | | | | | | |
%01a | % | Auxiliary costs on the labor | 0,02 | | | | | |
%02 | % | Indirect costs | 0,03 | | 0,38 | | | |
| % | Estimation of the degree of difficulty or uncertainty (normal: 1.00) | 1,00 | | | | | |
REU0573 | m² | Metal structural auxiliary galv profile 60x40 fake or similar ceiling plador plates. | 1,00 | 12,80 | 12,80 | | | |
RE0318 | m² | False continuous ceiling of plaster plates N13.5, with perimeter molding. | 1,00 | 23,41 | 23,41 | 7,09 | 0,42 | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Written by Vicente Almudéver | | | | | | |
| | | | | | | | |
| | Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Update 04/11/2014 | | | | | | |
| | Zone València | | | | | | |
| | Remarks: AV0045-PK0031 | | | | | | |
| | .......... | | | | | | |
| | Validated by ? | | | | | | |
| | Profile ? | | | | | | |
| | Validated by date 00/00/0000 | | | | | | |
| | Remarks: Notes del validador? | | | | | | |
| | edit price | | | | | | |
|