REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0368

Restoration and consolidation of moldings, imposts, flowers, etc.

1,00885,70885,70112,828,3512,74
Restoration and consolidation of moldings, imposts, flowers, etc., unique decorative elements on the facade eliminating damaged, broken or loose elements or in poor condition repair of mortars from the Sika house or similar. He previously applied a corrosion inhibitor mortar that works as a union bridge between the old work and the new type of Sika 110 or the like. The elements will be restored in the same form of the original even with molds if necessary.
%01%Auxiliary costs0,0216,87
%02%Indirect costs0,0325,31
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0204hMechanical drill1,102,352,592,591,10
REU0590Decorative fronton of facade modeling, of flower or similar, made by specialists, by means of an average thickness of the piece of 40 mm, even review of the edges and the relief profile. Fully finished and supplied to the site.1,00690,00690,00
REU0145kgSIKA CORROSION INHIBITOR AMBATEC Top 110-Epocem and Union Bridge, 4kg Boat, 3 components: A+B+C.0,554,152,28
REU0031kgMortar of structural resins, R4 applied product, in bags of 25 kg.28,000,6518,20
REU0016kgType of structural mortar 25kg, applies R3 product.5,000,854,25
REU0104CEM II/B-P 32.5 N Type M-5 Mortar of cement, work with 250 kg/m³ of cement and a proportion to volume 1/6.0,01115,501,04
REU0015kgB-500-S 6/16mm Profiles of corrugated, cutting and supply steel.2,000,781,56
REU0203hResin injection equipment0,751,220,920,920,75
REU0206kgEpoxy resin for injections0,8016,2012,96
REU0036mArmatex mesh fiber 44 plaster.0,500,820,41
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information4,5017,9380,6980,694,50
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information2,0014,3128,6228,622,00
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 04/11/2014
Zone València
Remarks: Notes de l'autor?
..........
Validated by ?
Profile ?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price