REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0370

Chopped for external walls cleaned surface by 30%.

1,0010,8410,849,270,8285,52
Chopped healthy for exterior walls, until the complete removal of old coatings and plasters cement mortar that are loose or damaged badly adhered with an average thickness of 3 cm, executed by mechanical procedure using small jackhammer driven compressor laptop or manual areas difficult to access, even on debris removal and loading and transport container or truck to dump the entire surface measured without deducting empty.
%01%ancillary costs0,020,19
%02%indirect costs0,030,28
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,3814,315,445,440,38
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,1817,933,233,230,18
REU0204hmechanical drill0,262,350,600,600,26
RE0128Waste Transport mixing container 4 m³0,0336,621,10
observations:
Considerando intervention of an area not exceeding 30%.
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 04/11/2014
zone València
observations: AV0001
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?