REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0375

Training leveled base in cement roof

1,0045,9545,9526,441,6257,54
Training flatbed on existing sloping roof of corrugated asbestos cement, consisting screed layer of medium thickness 6 cm lightened with arlita army, to create a flat base tilted and waterproofing with a layer asphalt LBM-40 FP self-protected mineral even training parapastas perimeter of the landfill arlita lightened and reinforced with steel mesh 31x31 mm 1.5 mm galvanized auxiliary, scaffolding necessary removal of excess material and total cleaning. Proven its tightness.
%01a%Ancillary costs of labor0,020,39
%02%indirect costs0,030,85
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0468Lightweight concrete compressive strength of 2.5 MPa, density 500 kg / m³ thermal conductivity 0.116 W / (mK), made on site with 1100 liters of expanded clay, grain size between 10 and 20 mm, density 275 kg / m³ and 150 kg of Portland limestone cement CEM II / BL 32,5 R according to UNE-EN 197-1.0,06134,008,04
REU0535Mesh 31x31 mm, 1.5 mm galvanized steel for reinforced concrete lightened.1,100,981,08
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,6014,318,598,590,60
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,6017,9310,7610,760,60
RE0374Covered with waterproofing LBM-40 FP mineral autoprotegida1,0016,2416,247,090,42
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 04/11/2014
zone València
observations: AV0001
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price