REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0376

Repair roof spoiler

1,0079,5279,5235,362,1644,47
Repair skirt covered less than 20 m, and a channel home with ceramic tile curved Arab type (1.70 kg / ut), aged artificially 50x23x15 CRN at a rate of 24-25 ut / m² and receiving cement mortar 11-35M-2,5A (1: 8), one in five rows perpendicular to the eaves, tile or ceramic flat central even redesign, placing the tiles with mortar squad settled on cake starting Hnea eaves, even cleaning and watering the surface, according NTE / QTT-11. Previously placed under a plate type Onduline under tile throughout the tile and on existing support.
%01%ancillary costs0,021,51
%02%indirect costs0,032,27
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0512Plate 15 asphalt waves and red three-layer corrugated profile, based on minerals and plant fibers saturated with bitumen emulsion at high temperatures, according to UNE-EN 534.1,2512,8016,00
REU0513uKey for setting board under tile.9,000,454,05
REU0104Mortar cement CEM II / B 32.5 N P-type M-5, made on site with 250 kg / m³ and a cement volume ratio 1/6.0,07115,508,09
REU0514uCeramic tile curve, 40x19x16 cm, straw color, according to UNE-EN 1304.34,000,3612,24
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information1,2317,9322,0522,051,23
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,9314,3113,3113,310,93
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 04/11/2014
zone València
observations: AV0001
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price