RE0379

Sealing of widespread cracks and cracks in brick factory

1,0015,6015,607,930,6050,83
Sealing of widespread cracks and cracks in the brick factory, with bastard mortar of lime and dosing cement M-160b (1: 0.25: 3) Natural color, even finish samples, color and texture to choose, after removing from Remains of existing mortar with pressure air, then the prepared mortar will be injected in the pistol filled up to an entrance, eliminating mortar burrs and surface cleaning as sealing is performed.
%01%Auxiliary costs0,020,30
%02%Indirect costs0,030,45
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0208kgAdhesive asphalt rubber type PB-II0,024,460,09
REU0209uElastomeric asphalt mass0,0340,001,20
REU0203hResins injection equipment0,101,220,120,120,10
REU0206kgEpoxy resin for injections0,3416,205,48
REU0207uResins injection nozzle1,500,100,15
MOU0005hOfficial 1st under construction. Professional level VIII (Source: Ive). / More information0,1817,933,233,230,18
MOU0006hOrdinary pawn under construction. Professional Level XII (Source: Ive). / More information0,3214,314,584,580,32
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 04/11/2014
Zone València
Observations: AV0001
..........
Validated by ?
Profile ?
Validated with date 00/00/0000
Observations: Notes del validador?
Edit price