REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0382m

Reconstruction of the element in forging intervigado

1,00104,65104,6543,462,6041,53
Reconstruction and blinded entrebigat element of the supply and laying of concrete vaults vibroprensadas, recessed type H10 / 12 cm, replacement armor / mesh of 20x20,5 mm armor reinforcement anchored perimeter and resin rods drilled every 30 cm 6 mm approx., concreting of the remaining section of concrete produced in situ H25 portable concrete mixer 250 l, swirling the surface and ready for finishing.
%01a%Ancillary costs of labor0,020,87
%02%indirect costs0,033,02
%Según Increase the difficulty of grado or Incertidumbre1,00
REU0191Formwork system partially wooden recoverable by execution massissats media in forged metal beams and vaults, propped up properly, repayable in 50 uses, including 4.5 meters.0,7526,0019,50
REU0450uSlab of concrete, 60x20x25 cm, even w / w of special pieces.5,500,663,63
REU0455kgCorrugated steel bars, rods, UNE-EN 10080 S 500 B, made in the workshop and placed in work, several diameters.8,001,159,20
REU0456Ø 20x20 mesh ME 5-5 B 500 T 6x2,20 UNE-EN 10080.0,901,851,67
REU0194Production of concrete HA-25 / B / 20 / IIa in work with portable electric mixer 250L.0,10233,0023,30
MOU0057h1st official structures. Professional level VIII (Source: IVE). / More information1,3017,9323,3123,311,30
MOU0058hAssistant structures. Professional level X (Source: IVE). / More information1,3015,5020,1520,151,30
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 15/11/2014
zone València
observations: AO0008
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?