REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0384

Crushed and replacement gypsum plaster underside forged

1,0016,3216,3211,950,8073,22
Healthy and replacement after the coating metal beams under ceiling in basement garage, chopped and cleaned prior to plastering the damaged or chipped, and embolsamientos removing loose material on underside of metal beams or concrete brushed dust and debris removal, application of primer binding resin liquid bridge Sikatop type-1 micromesh fiberglass and replacement with black plastering good view; o.g. auxiliary scaffolding necessary protection, removal of debris and cargo container.
%01a%Ancillary costs of labor0,020,10
%02%indirect costs0,030,25
%Según Increase the difficulty of grado or Incertidumbre1,00
RE0088Perforated Gypsum vertical.1,007,517,517,160,50
REU0009Paste plaster building B1, according to UNE-EN 13279-1, D22, with o.g. Woven fiberglass mesh, 5x5 mm light, flexible and rot over time, 70 g / m² surface mass and 0.40 mm thick wire for arm casts, proportion of plastic and metal corner stable to the action of sulphates.0,0378,851,97
REU0036m44 Armatex fiber mesh plaster.1,150,820,94
REU0724lSikatop 1, adhesive mortars, resin bonding may 5kg0,126,350,76
MOU0002hOrdinary laborer plasterer. Professional XII (Source: IVE). / More information0,1514,002,102,100,15
MOU0001hOfficial 1st plasterer. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 15/11/2014
zone València
observations: AO0008
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price