REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0384

Chopped plaster and replaced on the bottom of Forged

1,0016,3216,3211,950,8073,22
Sanoado and replacement of the lining unleashed under metal watches of dust forging, union of application of application of application with liquid resin Sikatop-1, micromalla of fiberglass and replacement with black plaster in Buena Vista; P.P. Auxiliary and scaffolding means, protections, removal of waste and container load.
%01a%Auxiliary costs on the labor0,020,10
%02%Indirect costs0,030,25
%AUMENT DE ACUERDO WITH THE GRADO OF DIFFICULTY OR Uncertainty1,00
RE0088Plaster chopped on vertical walls.1,007,517,517,160,50
REU0009B1 construction plaster, according to UNE-EN 13279-1, D22, with P.P. Fiberglass, 5x5 mm light, flexible and imputable with time passing, 70 g/m² surface mass and 0.40 mm thick thick, to mount plastic and metal lifeguards, stable for a the action of sulfates.0,0378,851,97
REU0036mArmatex mesh fiber 44 plaster.1,150,820,94
REU0724lSikatop 1, Morteros adhesive, Union bridge resin, 5kg boat0,126,350,76
MOU0002hOrdinary plasterist pawn. Professional level XII (Source: IVE). / More information0,1514,002,102,100,15
MOU0001h1st plasterist officer. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 15/11/2014
Zone València
Remarks: AO0008
..........
Validated by ?
Profile ?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price