REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0393m

Gotteron ceramic dumping on open balconies

1,0030,9430,9418,621,1660,18
Substitution of the first thread of tile pavement to the exterior facades, a piece that is crossed from slabs, chopped and lifted from the first ceramic tile and its grip mortar, placement of the new piece prefabricated with drips, of 30x25 cm dimensions, taken with a flexible mortar, P.P. of cuts and gaps in encounter with the metal verticals of the railings; Reversing parts, auctions, debris elimination and final cleaning; Totally finished.
%01a%Auxiliary costs on the labor0,020,37
%02%Indirect costs0,030,89
%AUMENT DE ACUERDO WITH THE GRADO OF DIFFICULTY OR Uncertainty1,00
REU0113CEM II/B-P 32.5 n cement mortar, hydrofugo, type M-10, work with 380 kg/m³ of cement and a proportion to volume 1/4.0,02143,152,86
REU0228Ceramic clothes of the enameled set 2/0/-/-, 30x30 cm, 8.00 €/m², according to UNE-EN 14411.1,008,008,00
REU0229kgWhite cement BL-22.5 x, for paving, in bags, according to UNE 80305.0,300,140,04
REU0230White cement grout BL 22.5 x.0,00157,000,16
MOU0033h1st Solidor Officer. Professional level VIII (Source: IVE). / More information0,4217,937,537,530,42
MOU0034hSolor Assistant. Professional level X (Source: IVE). / More information0,4215,506,516,510,42
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information0,3214,314,584,580,32
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 15/11/2014
Zone València
Remarks: AO0003
..........
Validated by ?
Profile ¿Notas de validador?
Validated by date 00/00/0000
Remarks: Notes del validador?