CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0395

Picado and replenishment enlocido yeso in the lower face of forged

1,0016,3516,3511,950,8073,09
Santeado and replacement of the reservoir gap dear viguetas metálicas de forjados in single-grade, prevented and sanitized of the enlocido of Yeso deteriorated or disconnected, elimination of slices and sufthic material, in the lower face of viguetas metálicas or of hormigón, cepillaado and elimination of subtraction de Polvo, application of printed printion union with liquid resin type Sikatop-1, micromalla of glass fiber and replacement with the latter of Yeso Negro in Buena Vista; P.P. Auxiliary media and necessarious andamiajes, protection, withdrawal of sweeps, load and transport to vertedero authorizado.
%01a%Auxiliary costs on the labor0,020,10
%02%Indirect costs0,030,25
%AUMENT DE ACUERDO WITH THE GRADO OF DIFFICULTY OR Uncertainty1,00
RE0088Plaster chopped on vertical walls.1,007,517,517,160,50
REU0009B1 construction plaster, according to UNE-EN 13279-1, D22, with P.P. Fiberglass, 5x5 mm light, flexible and imputable with time passing, 70 g/m² surface mass and 0.40 mm thick thick, to mount plastic and metal lifeguards, stable for a the action of sulfates.0,0378,851,97
REU0036mArmatex mesh fiber 44 plaster.1,150,820,94
REU0011lSetter printing for the interior with aqueous dispersion acrylic resins, especially indicated in plaster, white, applied with brush, roller or gun.0,107,850,79
MOU0002hOrdinary plasterist pawn. Professional level XII (Source: IVE). / More information0,1514,002,102,100,15
MOU0001h1st plasterist officer. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 21/01/2015
Zone València
Remarks: AO0008
..........
Validated by ?
Profile ¿Notas de validador?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price