REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0395

Picado and repositioned in plaster plastered underside of forged

1,0014,1014,109,800,6569,50
Adjusted and repositioned the coating desprendido under Viguetas metálicas of Forjados in basement-garage, prevent picado and adjusted the plastered plaster deteriorated or desconchado, elimination of embolsamientos and material loose in underside of Viguetas, metal or hormigón, Brushed and elimination of restos of powder, primer puente union applications with liquid resin type Sikatop-1 micromesh fiber fiberglass replacements and plastered with plaster negro Buena Vista; o.g. y medios auxiliary necesarios scaffolds, protections, removal of debris, loading and transport to vertedera autorizado.
%01a%Ancillary costs of labor0,020,10
%02%indirect costs0,030,25
%Según Increase the difficulty of grado or Incertidumbre1,00
RE0088Perforated Gypsum vertical.1,005,265,265,010,35
REU0009Paste plaster building B1, according to UNE-EN 13279-1, D22, with o.g. Woven fiberglass mesh, 5x5 mm light, flexible and rot over time, 70 g / m² surface mass and 0.40 mm thick wire for arm casts, proportion of plastic and metal corner stable to the action of sulphates.0,0378,851,97
REU0036m44 Armatex fiber mesh plaster.1,150,820,94
REU0011lInterior primer sealer for acrylic resins in water dispersion, especially recommended on plaster, white, applied by brush, roller or gun.0,107,850,79
MOU0002hOrdinary laborer plasterer. Professional XII (Source: IVE). / More information0,1514,002,102,100,15
MOU0001hOfficial 1st plasterer. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 21/01/2015
zone València
observations: AO0008
..........
Validated by ?
profile Notas del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price