CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0401u

Coordination Safety and Health in Rehabilitation Facade (10 UI)

1,00628,58628,58363,5015,4057,83
Health and Safety Coordination according to the Health and Health Study drafted for the works described in the execution project for the rehabilitation of a building or premises with intervention in 10 inspection units, in accordance with What is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of the Presidency.
%01a%Auxiliary costs on the labor0,022,21
%02%Indirect costs0,039,02
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0188uVisit to the work of the Health and Safety Coordinator, even travel4,6068,88316,85253,0011,50
MOU0068hSpecialist technician. Professional level II (Source: IVE). / More information1,3030,0039,0039,001,30
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information1,3025,0032,5032,501,30
MOU0081hTechnical director. Professional level II (Source: IVE). / More information1,3030,0039,0039,001,30
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,0090,0090,00
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,00100,00100,00
Remarks:
Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 18/03/2018
Zone València
Remarks: Partides relacionades: RE0183, RE0401, RE0402, RE0403.
..........