REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0407u

Project writing and facade rehabilitation management (10 UI)

1,002.450,612.450,611.574,5771,1964,25
Editorial project and studies and faculty management for the rehabilitation of facade with intervention in 10 inspection units, consisting of visiting the data technician, uprising of the current state, study and evaluation of existing pathologies and description of the solution for the rehabilitation of the facade, drafting of rehabilitation project, drafting of annex of scaffolding, writing of health and health study, writing of waste management study, works management, direction of works, Execution, Health and Safety Coordination, and Waste Management Coordination. Includes: visits and displacement.
%01a%Auxiliary costs on the labor0,02
%02%Indirect costs0,03
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0190uWriting of facade rehabilitation project (10 UI)0,601.104,30662,58512,8624,27
RE0193uFaculty Direction of Facade Rehabilitation (10 UI)0,60896,55537,93355,9715,96
RE0196uSafety and Health Study in Facade Rehabilitation (10 UI)0,60515,45309,27182,727,86
RE0164uWaste Management Study Writing in facade rehabilitation (10 UI)0,60552,58331,55203,949,66
RE0401uCoordination Safety and Health in Rehabilitation Facade (10 UI)0,60628,58377,15218,109,24
RE0404uCoordination Management Waste in Rehabilitation Facade (10 UI)0,60386,88232,13100,984,20
Remarks:
Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 19/03/2018
Zone València
Remarks: Partides relacionades: RE0189, RE0407, RE0408, RE0409.
..........