RE0417u

Direction of Rehabilitation Works (10 UI)

1,001.354,651.354,65962,5040,9571,05
Direction of the works described in the execution project for a building or premises with an intervention in 10 inspection units. Includes: 1 weekly visit to work, drafting complementary documents, control of work certifications, issuance of the final certificate of work and writing of the final project document, which will be collected by the final state of the works.
%01a%Auxiliary costs on the labor0,027,70
%02%Indirect costs0,0318,17
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0186uVisit to the works director, even travel10,5068,88723,24577,5026,25
MOU0063hTechnician. Professional level III (Source: IVE). / More information3,5022,0077,0077,003,50
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information5,6025,00140,00140,005,60
MOU0081hTechnical director. Professional level II (Source: IVE). / More information5,6030,00168,00168,005,60
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,1190,0099,74
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,21100,00120,80
Remarks:
Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 18/03/2018
Zone València
Remarks: Partides relacionades: RE0416, RE0417, RE0418, RE0419.
..........