REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0464u

Health and Safety Coordination installing elevator (lift 1)

1,00684,01684,01422,6619,0061,79
Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a local building or down to level 0 and 1 lift installation in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.
%01a%Ancillary costs of labor0,021,70
%02%indirect costs0,038,25
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0188uFurther work on the health and safety coordinator, including travel4,0068,88275,52220,0010,00
RE0272uStaff time managing administrative proceedings3,0018,0854,2451,663,00
RE0280uDedication of a technical oversight and layout of documents1,0069,3069,3066,003,00
MOU0068hSpecialist higher. Professional Level II (Source: IVE). / More information1,0030,0030,0030,001,00
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information1,0025,0025,0025,001,00
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information1,0030,0030,0030,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0090,0090,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,00100,00100,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0464, RE0465, RE0466, RE0467.
..........
Validated by
profile
Validated date
observations:
Edit price