REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0466u

Health and Health Coordination in Removal of Barriers (1 lifts)

1,00684,01684,01422,6619,0061,79
Health and Safety Coordination according to the Health and Health Study drafted for the works described in the execution project for the removal of architectural barriers in a building or premises, consisting of the installation of 1 elevators, d 'In accordance with the provisions of Royal Decree 1627/97, ​​of October 24, of the Ministry of the Presidency.
%01a%Auxiliary costs on the labor0,021,70
%02%Indirect costs0,038,25
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0188uVisit to the work of the Health and Safety Coordinator, even travel4,0068,88275,52220,0010,00
RE0272uDedication of staff to administrative management of a file3,0018,0854,2451,663,00
RE0280uDedication of a technician to the supervision and layout of the documentation1,0069,3069,3066,003,00
MOU0068hSpecialist technician. Professional level II (Source: IVE). / More information1,0030,0030,0030,001,00
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information1,0025,0025,0025,001,00
MOU0081hTechnical director. Professional level II (Source: IVE). / More information1,0030,0030,0030,001,00
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,0090,0090,00
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,00100,00100,00
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 28/10/2021
Zone València
Remarks: Partides relacionades: RE0464, RE0465, RE0466, RE0467.
..........
Validated by Joaquim Iborra Posadas
Validated by date 28/10/2021
Remarks:
edit price