CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0468u

Waste Management in coordination installing elevator (lift 1)

1,00468,97468,97249,6611,5053,24
Coordination Waste Management, according to the Waste Management Study prepared for the works described in the implementation plan for the elimination of architectural barriers in a building or local installation down to level 0 and 1 elevator in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.
%01a%Ancillary costs of labor0,021,54
%02%indirect costs0,038,01
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0499uVisit the work of coordinating waste management, including displacement1,0068,8868,8855,002,50
RE0272uStaff time managing administrative proceedings3,0018,0854,2451,663,00
RE0280uDedication of a technical oversight and layout of documents1,0069,3069,3066,003,00
MOU0063hTechnical. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information1,0025,0025,0025,001,00
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information1,0030,0030,0030,001,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0090,0090,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,00100,00100,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 18/03/2018
zone València
observations: Partides relacionades: RE0468, RE0469, RE0470, RE0471.
..........