RE0507m

Opening and excavation of ditches in buried collectors

1,0044,0844,0841,983,6595,24
Opening and excavation of pits for the new buried network of collectors of variable width between 0.60 m and 0.90 and 0.95 cm of medium depth, even the manual removal of existing soil and load in containers. laptops located on public roads, P.P. Restitation, level of level and establishments established by 2% from the points of origin at the foot of the evacuation of the low point and the end point. Unit completely executed and ready to receive the new collector pipe
%01a%Auxiliary costs on the labor0,020,84
%02%Indirect costs0,031,26
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0348hPortable diesel compressor 4 m³/min.0,354,701,651,650,35
REU0184hDemolish pneumatic hammer0,854,083,473,470,85
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information1,2514,3117,8917,891,25
MOU0023hSpecialist pawn under construction. Professional level XI (Source: IVE). / More information1,0515,5016,2816,281,05
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
Remarks:
The new network of collectors will be executed in parallel with the existing one, maintaining the use of the existing network as long as possible, until connecting and derived from each new branch
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 01/07/2015
Zone València
Remarks: AO0015
..........
Validated by ?
Profile ?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price