CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0507m

Opening and digging ditches collectors buried

1,0044,0844,0841,983,6595,24
Opening and digging ditches for the new underground network of collectors of variable width between 0.60 m and 0.90 and 0.95 cm average depth, even manual removal of existing land and container cargo placed laptop in public, pp layouts, elevations and earrings set average level of 2% since places of origin foot and lower end evacuation. Unit fully implemented and ready for the new sewer pipe
%01a%Ancillary costs of labor0,020,84
%02%indirect costs0,031,26
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0348hCompressor diesel portable medium pressure 4 m / min.0,354,701,651,650,35
REU0184hJackhammer devastating0,854,083,473,470,85
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information1,2514,3117,8917,891,25
MOU0023hPawn specialist in construction. Professional XI (Source: IVE). / More information1,0515,5016,2816,281,05
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
observations:
The new network of collectors will run parallel to the existing one, maintaining the use of the existing network as long as possible, until they connect and refer to each new branch
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 01/07/2015
zone València
observations: AO0015
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price