REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0510u

Forensics step in secondary network of 60x70 cm

1,00163,46163,46
Not registrable expertise, network of underground collectors, interior dimensions 60x70X75 cm, 24x12x11 cm honeycomb made of brick and cement mortar 1: 6-bed on concrete base hm-20 / B / 20 / I 12 cm thick, plastered burnished previously waterproofed mortar 1: 6, with rounded edges and painted asphalt emulsion, received superior piping and closing with hatch frame and precast concrete, even proportion of referrals individual accessories. Installation according to CTE. DB. HS safety. Preconditions support: Before beginning the activities relating to the implementation process will be conducted the following checks: will check that its location and route correspond to the Project and that there is enough space for installation and connection to the existing down. Includes presentation inside the chest tubes, special pieces, joints, fasteners, testing services, protection against shock, filling Trados chest perimeter, finishes, except for the floor finish. Training holes connected to tubes, sealing joints and interior-exterior. Even in airtight hatch closure and no odor mefítics frame.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,034,76
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0679uPericó step 50x50x70 cm. Buried built with brick ceramic solid 1/2 foot thick, received with cement mortar M-5 interior dimensions 50x50x70 cm, mass concrete slab on HM-30 / B / 20 / I + Qb 15 cm thick, minimum training slope of 2%, with the same type of concrete, polished and plastered inside with cement mortar M-15 forming a half round edges and corners, closed upper-framed and concrete lid. Even pieces of PVC for meetings, cut longitudinally, carrying with them the corresponding joints and settling them properly with the concrete at the bottom of skill manual excavation and filling the top surface with gravel material cement pipe connections and finishes. Fully assembled, and tested by the relevant connexionada testing service (included in the price).1,15138,00158,70
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 01/07/2015
zone València
observations: AO0015
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price