CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0511u

Pericó walk cranes inside of 75x75 cm

1,00206,10206,10
Pericó foot front line, inside the building, before the network connection via public sewer for the underground network of collectors interiors, interior dimensions of 75x75, profunidad average 1.10 m, Trappe 40 x40 cm, made of brick honeycomb 24x12x11 cm, with cement mortar 1: 6 on a bed-slab concrete hm-20 / B / 20 / i thick 12 cm, plastered burnished inwardly mortar waterproof 1: 6, rounded edges and painted with asphalt emulsion, received superior piping and closing with hatch frame and cast even proportion of referrals individual accessories. Installation according to CTE. DB. HS safety. Preconditions support: Before beginning the activities relating to the implementation process will be conducted the following checks: will check that its location and route correspond to the Project and that there is enough space for installation and connection to the existing down. Includes presentation inside the chest tubes, special pieces, elbows, joints, fasteners, testing services, protection against shock, filling Trados perimeter arch., Finishes, except for the floor finish. Training holes connected to tubes, sealing joints and interior-exterior. Even in airtight hatch closure and no odor mefítics frame.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,036,00
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0679uPericó step 50x50x70 cm. Buried built with brick ceramic solid 1/2 foot thick, received with cement mortar M-5 interior dimensions 50x50x70 cm, mass concrete slab on HM-30 / B / 20 / I + Qb 15 cm thick, minimum training slope of 2%, with the same type of concrete, polished and plastered inside with cement mortar M-15 forming a half round edges and corners, closed upper-framed and concrete lid. Even pieces of PVC for meetings, cut longitudinally, carrying with them the corresponding joints and settling them properly with the concrete at the bottom of skill manual excavation and filling the top surface with gravel material cement pipe connections and finishes. Fully assembled, and tested by the relevant connexionada testing service (included in the price).1,45138,00200,10
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 01/07/2015
zone València
observations: AO0015
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?