CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0514m

PVC sewer pipe buried-315 mm, filled ditch

1,0019,3819,3812,590,7064,96
Buried collector made with a smooth PVC pipe for sanitation, diameter 350 mm, binding thickness and glued under the UNE A 1401-E, with price increases of 30% for pipe joints, accessories and special pieces, placed in trench 700 + 250 mm wide, on a bed of sand / gravel thickness of 100 + 250 / 10 mm, not including excavation, filling and compacting the trench end, even concrete base Hm²0 / 20 / B / 15 cm and thickness prior to the placement of the floor finish. Unit completely finished and tested its operation. Application CTE.DB.HS health.
%01a%Ancillary costs of labor0,020,25
%02%indirect costs0,030,56
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0040Pocketspring sand.0,2520,005,00
REU0316lLiquid cleaner attached by adhesive PVC pipes and fittings.0,059,580,48
REU0317lAdhesive PVC pipes and fittings.0,0319,850,50
REU0143hRammer compactor roller 300 / 600kg.0,1028,002,802,800,10
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2014,312,862,860,20
MOU0035hOfficial 1st plumber. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
MOU0039hAssistant plumber. Professional level X (Source: IVE). / More information0,1015,501,551,550,10
observations:
The new network of collectors will run parallel to the existing one, maintaining the use of the existing network as long as possible, until they connect and refer to each new branch
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 01/07/2015
zone València
observations: AO0015
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price