REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0514m

PVC-315 mm pipe buried collector, stuffed trench

1,0019,3819,3812,590,7064,96
Buried collector made with a smooth PVC tube for sanitation, 350 mm diameter, joined and thick according to UNE standard In 1401-I, with an increase in the price of 30% tubes for joints, accessories and special pieces, placed in a ditch of 700+250 mm, on bed of sand / thick gravel 100+250 /10 mm, Without excavation, stuffed, stuffed, stuffed with the trench and the final compaction, even hm²0/20/and thickness of 15 cm, before the placement of the final pavement. Unit completely finished and verified. CTE.DB.HS Health Application.
%01a%Auxiliary costs on the labor0,020,25
%02%Indirect costs0,030,56
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0040Packed sand.0,2520,005,00
REU0316lLiquid cleaning to paste -s through the PVC bath and accessory adhesive.0,059,580,48
REU0317lPVC pipe accessories and accessories.0,0319,850,50
REU0143hPisón Roller Compactor 300/600kg.0,1028,002,802,800,10
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information0,2014,312,862,860,20
MOU0035h1st Officer of Fontanero. Professional level VIII (Source: IVE). / More information0,1517,932,692,690,15
MOU0039hAssistant of Fontanero. Professional level X (Source: IVE). / More information0,1015,501,551,550,10
Remarks:
The new network of collectors will be executed in parallel with the existing one, maintaining the use of the existing network as long as possible, until connecting and derived from each new branch
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 01/07/2015
Zone València
Remarks: AO0015
..........
Validated by ?
Profile ?
Validated by date 00/00/0000
Remarks: Notes del validador?