REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0516u

EDITION OF PRELIMINARY EVALUATION REPORT OF IEP Structure (1 UI)

1,00557,14557,14520,0123,5093,34
Report writing for the preliminary inspection and evaluation of the concrete structure (IEP) of 1 inspection unit, which collects the information of the written and graphic building in order to analyze the current state From the structure of the building, the presence of injuries or damage to the main or secondary structure and the presence of deterioration factors in the concrete and establishes the recommendations on the actions to be taken. Includes: Visit of the technician for inspection of the property.
%01a%Auxiliary costs on the labor0,027,37
%02%Indirect costs0,0311,05
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0156uRecognition visit, data collection, eye inspection or face -to -face intervention, even travel1,0068,8868,8855,002,50
RE0159uDedication of a technician to the eye recognition of an inspection unit in building or premises, without displacement1,0011,5511,5511,000,50
RE0278uDedication of a technician to current state rise1,0080,9380,9377,084,00
MOU0064hTechnical assistant. Professional level V (Source: IVE). / More information4,0020,5882,3282,324,00
MOU0063hTechnician. Professional level III (Source: IVE). / More information8,0022,00176,00176,008,00
RE0272uDedication of staff to administrative management of a file0,5018,089,048,610,50
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information2,0025,0050,0050,002,00
MOU0081hTechnical director. Professional level II (Source: IVE). / More information2,0030,0060,0060,002,00
Remarks:
The minimum inspection intensity considered is conditioned by the ease and access permit by the owners. Each of the following is considered to be an independent inspection unit: Each home regardless of the surface; A shop for commercial use, warehouse, garage or any other use different from housing, at the same level and up to 125 m² of built area or fraction. The criterion set by the preliminary inspection and evaluation guide of concrete structures in existing buildings DRB 04/06 of the Valencian Institute of Building is adopted.
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 26/03/2019
Zone València
Remarks: Partides relacionades: RE0516, RE0517, RE0518, RE0538.
..........
Validated by Joaquim Iborra Posadas
Validated by date 26/03/2019
Remarks:
edit price