REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (h)MANAGER MANAGEMENT REPERCUSSION (%)
RE0517u

Drafting of preliminary evaluation report of IEP structure (10 UI)

1,00890,80890,80837,7938,1594,05
Drafting report for the inspection and preliminary assessment of the concrete structure (IEP) of a building or local with 10 units of inspection, which collects the information from the written and graphic building with the objective of Analyze the current state of the structure of the building, the presence of injuries or damages in the main or secondary structure and the presence of deterioration factors in concrete and establishes the recommendations on the actions to be done. Includes: Technician Visit for Property Inspection (with an intensity of minimum inspection of 6 inspection units).
%01a%Auxiliary costs on labor0,0211,90
%02%Indirect costs0,0317,85
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
RE0156uVisit of recognition, data jack, eye inspection or face-to-face intervention, even displacement1,0068,8868,8855,002,50
RE0159uDedication of a technician to the ocular recognition of an inspection unit in building or local, without displacement6,0011,5569,3066,003,00
RE0278uDedication of a technician to the uprising of current state1,3080,93105,21100,205,20
MOU0064hTechnical assistant Professional level V (Source: Ive). / More information7,0020,58144,06144,067,00
MOU0063hTechnician Professional level III (Source: Ive). / More information14,0022,00308,00308,0014,00
RE0272uDedication of personnel to the administrative management of a file1,2518,0822,6021,531,25
MOU0066hTechnical coordinator. Professional level II (Source: Ive). / More information2,6025,0065,0065,002,60
MOU0081hTechnical Director Professional level II (Source: Ive). / More information2,6030,0078,0078,002,60
Observations:
The minimum inspection intensity considered is conditioned for ease and access permit by the owners. It is considered an independent inspection unit each of the following: Each housing regardless of the surface; A commercial location, warehouse, garage or any other use that is different from housing, at the same level and up to 125 m² of constructed area or fraction. The criterion set for the Preliminary Inspection and Evaluation Guide for concrete structures in existing buildings DRB 04/06 of the Valencian Institute of Building.
Drafted by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 26/03/2019
Zone València
Observations: Partides relacionades: RE0516, RE0517, RE0518, RE0538.
..........
Validated by Joaquim Iborra Posadas
Validated with date 26/03/2019