REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0528u

Determination of geometry and composition of deck building (CC)

1,00154,63154,63142,858,0092,38
Determination of geometry and composition of deck building (CC), consisting of bay from the outside for visual inspection, determining the composition and dimensions total and partial deck and characterization of meetings with Bonera and parapets, d according to the 'Guide to the Inspection and Evaluation complementary structures in buildings using existing hormigón' of the Valencian Institute of Building IVE (DRB 05/09). Includes shift personnel and equipment, toilets, furniture protection, preparation and aid work, graphic and photographic documentation of the bay, replacement of deleted items and issuance of certificate. Not included: auxiliary to heights exceeding 7 meters or replacement coatings.
%01a%Ancillary costs of labor0,022,86
%02%indirect costs0,034,42
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0068hSpecialist higher. Professional Level II (Source: IVE). / More information1,0030,0030,0030,001,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information3,5017,9362,7662,763,50
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information3,5014,3150,0950,093,50
REU0180uAnd auxiliary equipment for the execution of tastings structural elements or building construction.0,1045,004,50
observations:
The price of this item is subject to the ease and access permission from the owners.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 22/10/2015
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price