REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0536u

And structural characterization of materials in a pillar, beam or forged technology Radar PS 1000

1,00114,12114,1286,625,0075,90
Structural characterization and materials on a pillar, beam or forged technology Radar PS 1000 consisting documentation external dimensions and cracking previous scanning technology Radar PS 1000 non-invasive detection of the position of the armor thickness of the coating, number of bars and separation rings, diameter of reinforcement. Includes tours and travel, auxiliary, furniture protection, preparation and aid work, graphic and photographic replacement of deleted items and issuance of certificate. Not included: auxiliary to heights exceeding 7 meters or replacement coatings.
%01a%Ancillary costs of labor0,021,73
%02%indirect costs0,033,27
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0068hSpecialist higher. Professional Level II (Source: IVE). / More information0,5030,0015,0015,000,50
MOU0057h1st official structures. Professional level VIII (Source: IVE). / More information1,5017,9326,9026,901,50
MOU0058hAssistant structures. Professional level X (Source: IVE). / More information1,5015,5023,2523,251,50
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information1,5014,3121,4721,471,50
REU0180uAnd auxiliary equipment for the execution of tastings structural elements or building construction.0,5045,0022,50
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 28/02/2016
zone València
observations:
..........
Validated by
profile
Validated date
observations:
Edit price