CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0653u

Preliminary external audit of compliance with the CTE and other applicable regulations (1 UI)

1,00572,49572,49545,2224,7595,24
Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations in preliminary stage, for the verification of the technical documentation for a building project with intervention in the first inspection unit, consisting check integrity requirements documents, adequacy and suitability of projects and documents relating to the license or declaration, required by applicable law, proof that the projects and technical documentation justifying compliance with the provisions and regulations applicable prepare a report external control, in accordance with Law 5/2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia.
%01a%Ancillary costs of labor0,020,55
%02%indirect costs0,030,83
Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0555uDedication of a technical analysis review and a technical document8,0046,20369,60352,0016,00
RE0556uDedication of a technical report writing, justifying, in effect, control or compliance2,0046,2092,4088,004,00
RE0273uDedication of a technical issue certificate1,0046,2046,2044,002,00
RE0272uStaff time managing administrative proceedings1,0018,0818,0817,221,00
RE0280uDedication of a technical oversight and layout of documents0,2569,3017,3316,500,75
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information0,5025,0012,5012,500,50
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information0,5030,0015,0015,000,50
observations:
It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level. This price includes the drafting of a report on the performance of control; each report incidents or non-compliance will be billed separately, at a rate of 20% of the total cost of the game.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 25/04/2019
zone València
observations: Partides relacionades: RE0653, RE0661, RE0662,RE0663.
..........
Validated by Joaquim Iborra Posadas