REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0659u

Actions under construction external control energy certification (20 IU)

1,001.584,931.584,931.431,4665,0890,32
Monitoring and control of external certification of energy efficiency in the execution phase of work, for checking a finished building with 20 units of inspection in accordance with recognized document DRD 06/15 "criteria technical control external certification of energy efficiency of new buildings, "consisting of the external control program, record promoter compliance with that program prior to the start of the work, external control during the course of the execution of the work, identifying data Late work (DFO), the detection of deviations from the DEC and the issue of the external audit report, including, in If deviations from the grade calculation using the same calculation tool. Includes: travel and visits.
%01a%Ancillary costs of labor0,022,29
%02%indirect costs0,033,44
Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0555uDedication of a technical analysis review and a technical document5,3646,20247,58235,7910,72
RE0156uFurther recognition, data capture, inspection or face action, including travel7,3668,88506,88404,7418,40
RE0556uDedication of a technical report writing, justifying, in effect, control or compliance5,3646,20247,58235,7910,72
RE0273uDedication of a technical issue certificate1,0046,2046,2044,002,00
RE0272uStaff time managing administrative proceedings5,3618,0896,8992,285,36
RE0280uDedication of a technical oversight and layout of documents4,6169,30319,40304,1913,83
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information1,3725,0034,2934,291,37
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information2,6830,0080,3880,382,68
observations:
It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level. This price includes the drafting of a report on the performance of control; each report incidents or non-compliance will be billed separately, at a rate of 20% of the total cost of the game.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 25/04/2019
zone València
observations: Partides relacionades: RE0652, RE0658, RE0659,RE0660.
..........
Validated by Joaquim Iborra Posadas
Validated date 25/04/2019
Edit price