REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0665u

Actions under construction external control of compliance with the CTE and other applicable regulations (20 IU)

1,001.822,031.822,031.646,6774,8690,38
Monitoring and control of external compliance CTE Technical Building Code and other applicable regulations, under implementation work for the development of the verification work of building with 20 units in operation inspection consistent verifying the adequacy of the licensed works during his execution and to prepare the Technical Report of Compliance of finished works, the effect of the declaration or license of first occupation, in accordance with Law 5 / 2014 of 25 July, the Government, Spatial Planning, Urbanism and Landscape Valencia. Includes: travel and visits.
%01a%Ancillary costs of labor0,022,29
%02%indirect costs0,033,44
Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0555uDedication of a technical analysis review and a technical document8,0046,20369,60352,0016,00
RE0156uFurther recognition, data capture, inspection or face action, including travel8,3668,88575,76459,7420,90
RE0556uDedication of a technical report writing, justifying, in effect, control or compliance6,3646,20293,78279,7912,72
RE0273uDedication of a technical issue certificate1,0046,2046,2044,002,00
RE0272uStaff time managing administrative proceedings5,3618,0896,8992,285,36
RE0280uDedication of a technical oversight and layout of documents4,6169,30319,40304,1913,83
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information1,3725,0034,2934,291,37
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information2,6830,0080,3880,382,68
observations:
It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level. This price includes the drafting of a report on the performance of control; each report incidents or non-compliance will be billed separately, at a rate of 20% of the total cost of the game.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 25/04/2019
zone València
observations: Partides relacionades: RE0654, RE0664, RE0665,RE0666.
..........
Validated by Joaquim Iborra Posadas
Validated date 25/04/2019
Edit price