Facilities

CodeUDescriptionPrice
RE0238u

Essay for sealing covers, up to 100 m²

Sealing tests on covers in buildings, on an area of ​​up to 100 m², for the methods included in the document recognized by the Generalitat Valenciana DRC 05/09. It includes the displacement of the staff, watertight test after at least 8 hours of flood, inspection for the sealing of the cover system, income record and certificate issuance.

308,34 €
RE0239u

Essay for facade sealing, surface of 3 m².

Sealing tests on the façade with carpentry, according to the document recognized by the Generalitat Valenciana DRC 06/09

175,93 €
RE0240u

Water supply network check test

Service tests from the internal water supply network of buildings. Partial test of sealing and mechanical resistance for battery of meters and mounters, according to the document recognized by the Generalitat Valenciana DRC 07/09

214,97 €
RE0147u

Handicapped vertical elevator Enier Enier Eninin 1200x950.

Supply and installation of a small hydraulic vertical lift unit for people with reduced mobility, Enier Llevant, Eni Eninin model, platform of dimensions 1200x950 mm, payload 225 kg, two stops, hydraulic traction system with power valves Anti-Return, Speed ​​0.10 m / s, Single-phase food 230 V, Double boarding at 180 degrees with a cabin manual door painted with transparent polycarbonate and electrical lock, shipping switches to interior of the cabin, Stop push button to platform, security elements and stainless steel grip, body painted in rural 7035-gray, perimeter closures, door and railings; Fully installed, connected and checked your corrrect operation, approvals and installation certificate.

9.195,19 €
RE0148u

Emergency lighting in common areas, IP42 155 Lux luminaire.

Supply and installation of emergency luminaire, to ceiling, with fluorescent linear tube, 6 W - G5, light flow 155 lumens, 245x110x58 mm housing, class II, IP 42, with ni-cd d batteries D High temperature, autonomy of 1 hours, food at 230 V, load time 24 h. Even accessories, anchor elements and auxiliary material. Fully mounted, connected and tested.

69,34 €
RE0079

Microfiber mesh, Protection Vertical Works

Supply, placement and disassembly of protection mesh in vertical work, constituted by high density microfiber mesh, even fixations and anchors to fixed points. Not including daily rent.

3,23 €
RE0107u

Assembly and disassembly of canopy for pedestrian crossing. Tram 15 ml.

Assembly and disassembly of pedestrian crossing protection structure, with free step of 1.5 m in width and 3.0 m in height, formed by hot galvanized steel tubular structure, with superior roof for To pedestrian protection, and visor at an angle of 45 ° to avoid falling objects, prepared for the subsequent placement of an enactment in height that will serve as the basis for the execution of facade of 15 m, according to Mounting plans. Even accessories, protection systems, anchors and replacements.

550,17 €
RE0509u

Pericó on foot down, 50x50 cm.

Registratable Pericó at the bottom of the descent, in the underground network of collectors, of interior dimensions 50x50x60 cm, made with bresca bresca 24x12x11 cm, and with cement mortar 1: 6 on concrete bed hm-20 / b / 20/20/20/20/20/20 / and thick 12 cm, bryunted bryted earlier with mortar hydrofugated 1: 6, rounded edges and painted with asphalt emulsion, received from pipes and superior closure with trap and prefabricated concrete frame, even proportional part of individual derivations, connection to decline , accessories. Installation according to CTE. Db. HS HALLUBRITY. Prior conditions for support: Before starting activities corresponding to the execution process, the following checks will be made: it will be checked that your situation and route correspond to those of the project, and that there is sufficient space for your Installation and connection with the existing decline. Includes presentation inside the tubes, special pieces, elbows, junctions, fixations, service tests, protection against blows, stuffed by Arq perimeter trades., Finishes, Exception of the finishing pavement. Formation of holes for the connected of tubes, junctuous and interior-exterior jacket. Even hermetic closure in trap and frame in the passage of smells Muffytics

142,14 €
RE0511u

Pericó on the facade in the interior, from 75x75 cm

Pericó on the front line of the building, in the interior of the building, prior to the public network connection in public road, for the underground network of internal collectors, of interior dimensions 75x75, average profunity 1,10 m, Trap 40 x40 cm, made with bresca bresca 24x12x11 cm, and with cement mortar 1: 6 on HM-20 / B / 20/20 / and thick 3 cm concrete beds, bangy brunching interior with mortar hydrofugated 1: 6, Rounded edges and painted with asphalt emulsion, received from pipes and upper closure with trap and casting frame, even proportional part of individual derivations, accessories. Installation according to CTE. Db. HS HALLUBRITY. Prior conditions for support: Before starting activities corresponding to the execution process, the following checks will be made: it will be checked that your situation and route correspond to those of the project, and that there is sufficient space for your Installation and connection with the existing decline. Includes presentation inside the tubes, special pieces, elbows, junctions, fixations, service tests, protection against blows, stuffed by Arq perimeter trades., Finishes, Exception of the finishing pavement. Formation of holes for the connected of tubes, junctuous and interior-exterior jacket. Even hermetic closure in trap and framework at the passage of meafitic odors.

206,10 €
RE0510u

Pericó de Pas, in secondary network, of 60x70 cm

Registration pericon, in the underground network of collectors, of interior dimensions 60x70x75 cm, made with bresca bresca 24x12x11 cm, and with cement mortar 1: 6 on concrete bed hm-20 / b / 20 / and Thickness 12 cm, bryunted bryted earlier with mortar hydrofugated 1: 6, rounded edges and painted with asphalt emulsion, received from pipes and upper closure with trap and prefabricated concrete frame, even proportional part of individual derivations, accessories. Installation according to CTE. Db. HS HALLUBRITY. Prior conditions for support: Before starting activities corresponding to the execution process, the following checks will be made: it will be checked that your situation and route correspond to those of the project, and that there is sufficient space for your Installation and connection with the existing decline. Includes presentation inside the tubes, special pieces, junctions, fixations, service tests, protection against hits, filling trados perimeter arqueta, finishes, except for the finishing pavement. Formation of holes for the connected of tubes, junctuous and interior-exterior jacket. Even hermetic closure in trap and framework at the passage of meafitic odors.

163,46 €
RE0398u

Protection of interior furniture

Protection of the interior furniture of a house or premises, prior to an intervention of work, through its coverage with sheet of transparent polyethylene and disassembled of elements susceptible to breakage, such as mirrors, etc.

85,77 €
RE0487u

Passive protection RF-90 rock wool.

Passive fire protection of all metallic elements arranged in the project. Both the existing reinforcements, IPE profiles under Bigaetes, such as UPN conforming the beam, as well as the new profiles of the reinforcement reinforcement system valued in the measurement. Performed by means of projection of retardant of rock wool for metal structures, to achieve an RF-90.

23,11 €