Partition

CodeUDescriptionPrice
RE0040

Demolition of internal partition factory coated, thick 4/5/7 cm.

Demolition of interior partition factory coated, formed by simple vacuum brick of 4 to 7 cm thick, with manual means, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, removal and cargo manual of rubble on truck or container.

5,26 €
RE0042

Demolition of interior partition factory coated, 5 cm massive brick in Panderete.

Demolition of interior partition factory coated, formed by massive brick in Panderete of 5 cm thick, with manual means, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, removal and cargo manual of rubble on truck or container.

6,76 €
RE0041

Demolition of interior partition factory coated, perforated brick Thickness 11 cm.

Demolition of internal partition factory coated, formed by perforated brick of 11/12 cm thick, with manual means, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, removal and cargo manual of rubble on truck or container.

9,32 €
RE0230

Indoor leaf Facade closure, with LH-7 + isolate PE-40.

Formation of internal partition leaf of 7 cm of factory thickness, of double double ceramic brick, to coat, 33x16x7 cm, received with M-5 cement mortar and internal insulation with 40 mm expansive polystyrene plates of 40 mm. of thickness, even P / P rethinking, leveling and appliance, received from rings and basic buildings, minions, breaks, linked, heads and cleaning

29,89 €
RE0263

Partition LH-7 brick leaf, topparts passing

Partition of an empty ceramic brick sheet of 7 cm thick, made with pieces of 24x11.5x7 cm Sunstalled and received with M-5 cement mortar, with joints of 1 cm thick, without coating, All reconsideration, leveling and aforementioned, proportional part of links, mining and ruptures, moistened from the pieces and cleaning, considering 3% losses and 30% mortar minions, according to NBE-FL-90 and NTE-PTL.

12,71 €
RE0048

Internal partition, ceramic brick factory for LH-11 coating.

Formation of internal partition leaf of 1/2 Foot of factory thickness, of ceramic brick Empty triple, to coat, 33x16x11 cm, received with mortar of M-5 cement. Even proportional part of rethinking, leveling and appliance, received from rings and basic buildings, minions, breaks, tied, heads and cleaning.

20,95 €
RE0047

Internal partition, ceramic brick factory for LH7 coating.

Formation of internal partition leaf of 7 cm of thickness factory, of double ceramic brick double, to coat, 33x16x7 cm, received with mortar of M-5 cement. Even proportional part of rethinking, leveling and appliance, received from rings and basic buildings, minions, breaks, tied, heads and cleaning.

23,11 €
RE0090

Rockwool system of direct trasdosat, of laminated plaster plates with built-in insulation, in facade closures.

Direct extraded on interior partition, made with laminated plasterboards - | (10 + 30) (LR) Labelrock 406.110 | Rockwool, with rock wool isolation, 30 mm thick, incorporated into the plate, received with binding material on the vertical setting; and 55 mm of total thickness, even proportional part of reconsideration of the finished line of parament, from the zones of passage and gaps; successive placement, for each plate, of the pallets of binding paste in the support of support; Cut the plates, placement of wedges in the lower part and individual placement of plates through pressure on pallets; Together for dilation; treatment of areas of passage and gaps; Execution of angles; Treatment of joints through pasta and tape of boards; Received from the boxes for accommodation of electrical and installation mechanisms, prior rethinking of its location on the plates and drilling them, and final cleaning. Fully finished and ready to enter, paint or coat.

29,05 €