Auxiliary means

CodeUDescriptionPrice
RE0572%

Work control actions for the reception of products

Minimum and necessary control actions in work for the reception of products in accordance with the provisions of article 6.1.2 and in Annex 1 of the Technical Building Code (CTE) approved by Royal Decree 314/2006, March 17, or norm that replaces it, even drafting of the corresponding plan of work of the contractor, who will have to foresee the material and human resources that will participate in the work and the sequence of parts or phases of Work, as well as the times planned in planning. Even support palette support for work executed by entities or laboratories of external control.

1,03 €
RE0434u

Coordination safety and health in rehabilitation building (1 UI)

Coordination of health and safety according to the study of safety and health drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 1 inspection unit, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

560,47 €
RE0435u

Coordination safety and health in rehabilitation building (10 UI)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 10 inspection units, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

793,89 €
RE0436u

Coordination safety and health in rehabilitation building (20 ui)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 20 inspection units, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

899,62 €
RE0437u

Coordination safety and health in rehabilitation building (50 UI)

Coordination of health and safety according to the health and safety study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 50 units of inspection, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

1.105,11 €
RE0602u

Security and Safety Study in New Construction Building (1 UI)

Drafting of the health and safety study for works described in the project for executing new construction for a building or local with intervention in 1 inspection unit, in accordance with what is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

571,35 €
RE0456u

Safety and Health Study at Elevator Installation (1 Elevator)

Drafting of the health and safety study for the works described in the project of execution for the elimination of architectural barriers in a building or premises with descent at Cota 0 and installation of 1 elevator, according to What is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

526,43 €
RE0457u

Safety and health study in elevator installation (2 elevators)

Drafting of the health and safety study for the works described in the project of execution for the elimination of architectural barriers in a building or premises with descent at Cota 0 and installation of 2 elevators, according to What is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

652,10 €
RE0458u

Safety and Health Study in Elevator Installation (3 elevators)

Drafting of the health and safety study for the works described in the project of execution for the elimination of architectural barriers in a building or premises with descent at Cota 0 and installation of 3 elevators, according to What is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

704,14 €
RE0459u

Safety and health study in elevator installation (4 elevators)

Drafting of the health and safety study for works described in the project of execution for the elimination of architectural barriers in a building or premises with descent at Cota 0 and installation of 4 elevators, according to What is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

744,11 €
RE0421u

Safety and health study in rehabilitation (1 UI)

Drafting of the health and safety study for works described in the project for the execution of rehabilitation for a building or local with intervention in 1 inspection unit, in accordance with what is established in the Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

371,39 €
RE0422u

Rehabilitation safety and health study (10 UI)

Drafting of the health and safety study for the works described in the project for the execution of rehabilitation for a building or local with intervention in 10 inspection units, in accordance with what is established in the Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

452,45 €
RE0423u

Safety and health study in rehabilitation (20 UI)

Drafting of the health and safety study for the works described in the project for the execution of rehabilitation for a building or premises with intervention in 20 units of inspection, in accordance with what is established in the Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

489,16 €
RE0424u

Safety and health study in rehabilitation (50 UI)

Drafting of the health and safety study for the works described in the rehabilitation execution project for a building or local with intervention in 50 inspection units, in accordance with what is established in Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

560,51 €
RE0102u

Bastida rental of façade 30 days. Surface 250 m².

Rental, for 30 calendar days, standardized tubular scaffolding, multidirectional type, up to 10 m in maximum height of work, formed by hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm of thickness, without duplicity of vertical elements, composed of work platforms of 60 cm wide, arranged every 2 m in height, interior scale with trap, back railing with two bars and surroundings, and front railing with a bar; For the execution of facade of 250 m², considering as an area of ​​facade the resulting of the product of the projection in plant of the perimeter more out of the facade for the maximum work height of the scaffolding. Even proportional part of flexible network, monofilament mosquito net, 100% polyethylene ..

695,25 €
RE0079

Microfiber mesh, Protection Vertical Works

Supply, placement and disassembly of protection mesh in vertical work, constituted by high density microfiber mesh, even fixations and anchors to fixed points. Not including daily rent.

3,23 €
RE0039m

Anticable protection canopy of objects for sidewalk protection. With rent for 1 month.

Supply, assembly and disassembly of antica protection marquise of objects, formed by tubular structure with frames or modules of galvanized metal profiles, lower pedestrian crossing formation, crossbars, sloping visor at 30º and flown at 1, 50 m, Metal plates of superior curd placed transversally and fixed to frames, supported on leveling screws and motherboard, even signaling of the work area

32,04 €
RE0369%

Measures in the field of waste management in work

Measures in the field of waste management to be adopted by the contracting company of the works so that it can carry out its obligations in this field, facilitating its development under the control of the coordinator in the field of waste management during the execution Of the work, in accordance with the corresponding studies and plans and with Royal Decree 105/2008, of February 1, which regulates the production and management of construction and demolition waste.

1,55 €
RE0134%

Measures in matters of safety and health in work

Measures in the field of health and safety to adopt for the contracting company of the works so that it can carry out its obligations in the field of the prevention of professional risks, facilitating its development under the control of the coordinator in the field of security and Health during the execution of the work, in accordance with the corresponding studies and plans and with Royal Decree 1627/97 of October 24, even drafting of health and health plan.

2,58 €
RE0261m

Assembly and disassembly Bastida hanging, in the interior courtyard

Mounted and disassembled with scaffolding hanging on the height of 25 ml, even installation with superior counterweights, maintenance, lower protection tray, security and transport systems.

174,40 €
RE0260m

Assembly and disassembly of hanging scaffolding, on an exterior facade.

Mounted and disassembled with scaffolding hanging on the height of 25 ml, even installation with superior counterweights, maintenance, lower protection tray, security and transport systems.

51,60 €
RE0356

Assembly and disassembly of standardized hanging scaffolding

Assembly and disassembly of scaffolded Bastida Normalized counterbalanced, totally approved and legalized in compliance with the standard of construction and health of the construction, from the general flat roof of the building, composed of a work platform of 250x60 cm, railing, fishing counterweight 500 kg / ud, elevation and descent pulleys with brake and device, guide, steel cables, hooks and gases. In the difficult areas, it will be carried out through vertical disengagement techniques, with workers linked to harness using security equipment approved by the EEC, large parachute network trays, and installing the corresponding networks and / or vertical protection meshes, in microfiber type material; Unit totally installed and with proven and verified security measures according to current regulations.

8,59 €
RE0101u

Assembly and disassembly of coat of façade tubular, 250m².

Assembly and disassembly of standard tubular scaffolding, multidirectional type, up to 10 m high work height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; For facade execution of 250 m², according to assembly plans, considering a maximum distance of 20 m between the download point of the materials and the point further away from the assembly. Even proportional part of assembly and dismantling of flexible network, monofilament mosquito net, 100% polyethylene, accessories, protection systems, anchors and replacements. Assembly, dismantling and rent for the first month.

1.996,88 €
RE0024u

Scissors platform, for a height of 15 meters and 1000 kg (1 d) capacity

Use of diesel scissors platform for maximum work height equal to 15 m, abroad, in metropolitan area of ​​Valencia, maximum capacity of 1000 kg, even transportation to work and collection, rental for 1 day of permanence in work , sure of circulation and signaling of work area.

211,33 €
RE0103u

Transport and withdrawal of tubular tubular scaffolding. 250 m².

Transport and withdrawal of standard tubular scaffolding, multidirectional type, up to 10 m high work height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; for facade execution of 250 m².

498,57 €
RE0188u

Visit to the work of the Safety and Health Coordinator, even displacement

Visit to the work of the Safety and Health Coordinator, which will have to coordinate the activities of the work to ensure that the contractors and, where appropriate, the subcontractors and the autonomous workers apply in a coherent and responsible way the preventive action described in L 'Security and health study and in the corresponding plan. Includes displacement.

68,88 €