Factories

CodeUDescriptionPrice
RE0089

Insulation for insufflation, from the inside, in double leaf-leaf closure air chambers.

Energy rehabilitation of double leaf facade Factory, from the interior of the house, 50 mm air chamber of medium thickness, by injection of natural mineral wool nodules (LMN) without binders, Borralw (Tip S) Knauf Insulation , with density 30 kg / m³ and thermal conductivity 0.038 W / (MK); Tapa of the holes executed in the parament, by means of massillat and lying. Included proportional part of machinery for injection, making holes, protection of contiguous elements and cleaning surface to be painted. Fully finished. Includes: Carrying out drills in the parament; Protection of the elements of the environment that can be affected during injection work; Injection of isolation; Tapat of the drills.

27,68 €
RE0050

Breaked cement mortar base, master.

Training on facades and interior walls, of base layer of 15 mm thick, for continuous double layer coatings, with plastering of cement mortar, gray, cement composite, selected aggregates and additives, end-up, waterproof finish 'rain water. Manually applied on a ceramic brick surface, brick or concrete block or thermoargile block. Even proportional part of preparation of the surface support, placement of fiberglass mesh antalcalis for reinforcement of meetings between different materials and in the forged fronts, 20% of the surface of the parament, training of boards , corners, masters, edges, grinding, branches, lintels, finishes in meetings with walls, coatings or other elements received on their surface.

18,79 €
RE0049

Base buzzer, with cement mortar in good view.

Formation on facades and interior walls, of 15 mm thick layer, for continuous double layer coatings, with plastering in good view of cement mortar, gray, cement composed, selected aggregates and additives, endewly finished, waterproof to rainwater. Manually applied on a ceramic brick surface, brick or concrete block or thermoargile block. Even proportional part of preparation of the surface support, placement of fiberglass mesh antalcalis for reinforcement of meetings between different materials and in the forged fronts, 20% of the surface of the parament, training of boards , corners, masters, edges, grinding, branches, lintels, finishes in meetings with walls, coatings or other elements received on their surface.

13,41 €
RE0228m

Conduct ventilation for forced extractor at local, PVC-125 tube.

Installation of ventilation conduit for extraction air Vicied indoor bathroom and / or toilet of commercial premises, by means of disposition, fixed to a wrought ceiling, PVC-125 mm tube, derivation piece T-125 and junction in tube aluminum Flexible Spiroflex -125 to the unit of the forced extractor, even vacuum opening going on external façade and exterior grid 25x24 aluminum lacquered white. Fully installed and connected.

25,21 €
RE0137m

Static stitch cracks in ceramic brick enclosures.

Static sewing sewn on ceramic brick factory through the inclusion of corrugated steel staples B 500 s of 10 mm in diameter and 30 cm in length, placed every 30 cm, crossing the fissure transversally, comprising: opening boxes ( as regatta) perpendicular to the direction of the fissure; Cleaned, wet and fucked from these, received from the staples in boxes with cement mortar and slightly addictive lime, dosing 1: 0.5: 4, because there are no excessive retractions, placement of staples and filling of The boxes to the level of the parament and the fissure already sewed with thixotropic mortar in injected pressure in controlled pressure.

29,22 €
RE0040

Demolition of internal partition factory coated, thick 4/5/7 cm.

Demolition of interior partition factory coated, formed by simple vacuum brick of 4 to 7 cm thick, with manual means, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, withdrawal and manual load of rubble on truck or container.

5,26 €
RE0042

Demolition of interior partition factory coated, 5 cm massive brick in Panderete.

Demolition of interior partition factory coated, formed by massive brick in Panderete of 5 cm thick, with manual media, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, withdrawal and manual load of rubble on truck or container.

6,76 €
RE0041

Demolition of interior partition factory coated, perforated brick Thickness 11 cm.

Demolition of interior partition factory coated, formed by perforated brick of 11/12 cm thick, with manual means, without affecting the stability of the contiguous constructive elements. Even proportional part of demolition of its coatings (plaster, mortar, tiled, etc.), embedded facilities and carpentry, prior disassembly of the leaves; Cleaning, gathering, withdrawal and manual load of rubble on truck or container.

9,32 €
RE0072

Fitted in Mur Masseixa factory, for tied hoop.

Profiling fitting made of brick factory wall, with pneumatic hammer, with a smaller thickness than the total wall of the wall, for housing of tied or duct rings, without including making shoes, even withdrawal of demolition and load About truck or container, without including landfill transport, according to NTE / ADD-13.

144,72 €
RE0086

Tiled Catalan Baldosí, in forged cantilever.

Supply and execution of facade pavement, by means of thick layer method, with Catalan tile of 12x24 cm, received with mortar of cement m-5 of 3 cm thick, moistened and sprinkled with the surface, rejunctured with cement bean At the minimum board, even part of the reconsiderations, cuts, training of together and socket, elimination of excess material and final cleaning.

24,87 €
RE0591

Pluvial shutter, maximum thickness 65 mm, with bituminous wavy plates

Execution of pluvial wall of maximum thickness 65 mm, formed by bituminous wavy plates type Onducober, or similar, with disposal of overlaid plates and fixed to the parament directly with empty keys, and perimeter cars of prelacada sheet, with thermic insulation installed by The inner face of waterproofing through extruded polystyrene rigid panel, according to UNE-EN 13164, 50 mm thick, thermal resistance 0.79 m² / w, thermal conductivity 0.039 W / (MK), 200 KPA resistance to compression , factor of resistance to the dissemination of water vapor 150 and specific heat 1400 J / kgk. Even proportional part of the insulating clippings.

26,90 €
RE0235m

10x2 cm calcareous stone spitter, with breakage.

Formation of Capri limestone Capri or similar, from 110 to 150 cm in length, from 8 to 10 cm in width and 2 cm thick, with trencaaaaas, face and edge polished, with clear slope and embedded in the jambs, Covering the sills, the departments of the parameters, the facade cornices, etc., received with mortar of hydrophift cement M-10. Even P / P of preparation and regularization of support with mortar mortar M-10, riddled between pieces and unions with walls with mortar of special boards for natural stone coatings.

16,08 €
RE0220

Armed Factory Concrete block 40x20x10, Resistance R10.

Exterior leaf of 10 cm thick factory, in facade closure, vacuum concrete block, to coat, gray, 40x20x10 cm, standardized resistance R10 (10 n / mm²), armed with horny galvanized murfor armor armor , RND.4 / Z or similar, diameter 4 mm, 80 mm width, encased type, with proportional part of riding and hooks for lintels and corners, received with mortar of cement M-7.5, with minimum support of 2 / 3 parts of the block on the forged, or on hot galvanized steel angular attached to forged fronts if, due to execution errors, the blog does not support its 2/3 parts on the forged and armed with armor of Hot galvanized murfor, rnd.4 / z or similar, diameter 4 mm, 80 mm width, encased type, placed in yarns every 50 cm approximately and at least in the factory boot on forged, under breaks and above Gaps loader, with a 1 kg / m² amount and with connection devices, ANCL Ajes, Keys and Metallic fixations, for the subjection or retention of the factory to the structural elements. Even proportional part of links, mines, breaks, encounter with pillars, cantonades formation, covered and cover formation by means of lintel pieces with armor and mace of concrete, jambs and grindings, together of expansion, execution of meetings and points Singular

48,54 €
RE0091

Façade of double leaf of sheet profiled sheet of steel, with intermediate insulation.

Double-leaved facade closure, formed by exterior panel profile of profiled steel ribbed S320 Galvanized Galvanized of 0.6 mm thickness and 30 mm crest height, insulation of non-hygroscopic glass wool blanket covered by one of its faces With a reinforced glass veil, according to UNE-EN 13162, 60 mm thick and tray interior tray of galvanized steel ribban tray of 0.6 mm thickness, even proportional part of horsemen, mines and accessories of Hidden and sealing fixation and other elements and works necessary for the formation of gaps, boards, corners, rowing and encounters with other materials. Fully mounted, withdrawal of excess material and load in containers.

44,54 €
RE0230

Indoor leaf Facade closure, with LH-7 + isolate PE-40.

Formation of internal partition leaf of 7 cm thick factory, double-handed double ceramic brick, to coat, 33x16x7 cm, received with M-5 cement mortar and internal insulation with 40 mm expansive polystyrene plates of 40 mm. of thickness, even p / p rethinking, leveling and appliance, received from rings and basic buildings, minions, breaks, linked, heads and cleaning

29,89 €
RE0102u

Bastida rental of façade 30 days. Surface 250 m².

Rent, for 30 calendar days, standardized tubular scaffolding, multidirectional type, up to 10 m high height of work, formed by hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm of thickness, without duplicity of vertical elements, composed of work platforms of 60 cm wide, arranged every 2 m in height, interior scale with trap, rear railing with two bars and environments, and front railing with a bar; For the execution of facade of 250 m², considering as an area of ​​facade the resulting of the product of the projection in plant of the perimeter more out of the facade for the maximum work height of the scaffolding. Even proportional part of flexible network, monofilament mosquito net, 100% polyethylene ..

695,25 €
RE0101u

Assembly and disassembly of coat of facade tubular, 250m².

Mounting and disassembly of standardized tubular scaffolding, multidirectional type, up to 10 m high working height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; For facade execution of 250 m², according to assembly plans, considering a maximum distance of 20 m between the download point of the materials and the point further away from the assembly. Even proportional part of assembly and dismantling of flexible network, mosquito net type monofilament, 100% polyethylene, accessories, protection systems, anchors and replacements. Assembly, dismantling and rent for the first month.

1.996,88 €
RE0129

Load factory wall 1/2 thick foot.

Load wall, 1/2 Foot of factory thickness, perforated ceramic brick (panal), to coat, 24x12x9 cm, received with M-5 cement mortar, even buildings and auxiliary means to a maximum height 3 m, withdrawal of demolition, cleaning and loading in container.

28,91 €
RE0263

Partition of LH-7 brick leaf, finished with gaps passing

Partition of an empty ceramic brick sheet of 7 cm thick, made with pieces of 24x11.5x7 cm sealed with singing and received with M-5 cement mortar, with joints of 1 cm thick, without coating, All reconsideration, leveling and aforementioned, proportional part of links, mines and ruptures, moistened from the pieces and cleansing, considering 3% losses and 30% of mortar minions, according to NBE-FL-90 and NTE-PTL.

12,71 €
RE0048

Internal partition, ceramic brick factory for LH-11 coating.

Formation of interior partition sheet of 1/2 Foot of factory thickness, of ceramic brick Empty triple, to coat, 33x16x11 cm, received with mortar of M-5 cement. Even proportional part of rethinking, leveling and appliance, received from basic rings and buildings, mining, breaks, tied, heads and cleaning.

20,95 €
RE0047

Internal partition, ceramic brick factory for LH7 coating.

Formation of internal partition leaf 7 cm thick factory, double-handed ceramic brick, to coat, 33x16x7 cm, received with M-5 cement mortar. Even proportional part of rethinking, leveling and appliance, received from basic rings and buildings, mining, breaks, tied, heads and cleaning.

23,11 €
RE0087

Chopped pieces brick face view / plate of 2 cm.

Superficial crushed ceramic bricks face deteriorated view, on exterior facades, and emptying them in a thickness of 2 cm, for subsequent placement in their place of ceramic plates, even withdrawal of demolition and load on Container for transportation to authorized landfill.

11,26 €
RE0108

Acrylic plastic paint on exterior walls. Facades

Decorative coating facades with smooth plastic paint, for the realization of the finishing layer in continuous double layer coatings; Previous cleaning and rubbing of industrial mortar support, background hand and two finishing hands (performance: 0.1 l / m² each hand), as well as treatment against the presence of mold or humidity in 10% of its Surface

9,96 €
RE0164u

Drafting of Waste Management Study in Rehabilitation of Façade (10 UI)

Drafting of the Waste Management Study for Works described in the Facade Rehabilitation Execution Project with intervention in 10 inspection units, in accordance with what is established in Royal Decree 105/2008, From February 1, 2008, from the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

552,58 €
RE0501u

Guardamalleta Emplafon Repair

Repair of the Emplafon of the Guardamalleta of façade windows, according to the two solutions specified in the plans nº 7 and 8. The solution to adopt in work will be in accordance with the indications of the D.F. The cleaning-desoxycated will be careful in accordance with the six 055,900 standard, SA2½ finish and passivizing treatment of the existing metal parts. Final protection with color glicerofthalic enamel to define for D.F. The final finish will correspond to the treatments specified in vertical facade rep.b).

RE0002

Painting coating in exterior silicate

Decorative coating facade with paint in silicate, for the realization of the finishing layer in continuous double layer coatings; Clean and repeat prior to support in good conservation, background with a preparation based on potassium silicate and acrylic emulsions and two finishing hands (performance: 0.167 l / m² each hand).

11,10 €
RE0090

Rockwool system for direct trasdosat, laminated plaster plates with built-in insulation, in facade closures.

Direct extradossat on interior partition, made with laminated plasterboards - | (10 + 30) (LR) Labelrock 406.110 | Rockwool, with rock wool isolation, 30 mm thick, incorporated into the plate, received with binding material on the vertical setting; and 55 mm of total thickness, even proportional part of reconsideration of the finished line of parament, the zones of passage and gaps; successive placement, for each plate, of the pallets of binding paste in the support parament; Cut the plates, placement of wedges in the lower part and individual placement of plates through pressure on pallets; formation of expansion together; treatment of areas of passage and gaps; Execution of angles; Treatment of boards through pasta and board tape; Receipt of boxes for accommodation of electrical and installation mechanisms, prior rethinking of its location on the plates and drilling them, and final cleaning. Fully finished and ready to enter, paint or coat.

29,05 €
RE0121

Thermocal thermocal system of thermal insulation and mineral facades coating.

Facade energy rehabilitation, through thermal insulation and mineral facade coating, on its outer face, with the Thermocal Dbblok system, consisting of a layer of mortar of thermal and acoustic insulating, thermocal, 20 mm thick, applied through Mechanical projection with a 15 kg / m² performance, and a layer of lime monolayer mortar, Ibercal Master 450 Thermo, endeared finish, color to choose, 10 mm thick.

32,07 €
RE0103u

Transport and withdrawal of tubular tubular scaffolding. 250 m².

Transport and withdrawal of standardized tubular scaffolding, multidirectional type, up to 10 m high working height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; For facade execution of 250 m².

498,57 €