Factories

CODEUDESCRIPTIONPRICE
RE0089

Insulation for inflation, from the inside, in air chambers closing double blade factory.

Energy renovation of facade of double sheet factory, from inside the house, air chamber of 50 mm thick medium by injection of natural mineral wool nodules (LMN) without binders, BorraLW (TERVOLA S) Knauf Insulation with density 30 kg / m³ and thermal conductivity 0.038 W / (mK); covered holes executed in the household using putty and sanding. Including machinery proportion of injection holes realization, protection and cleaning elements adjacent surface to be painted. Fully finished. Includes conducting drills in the household; protection of elements of the environment that may be affected during construction of injection; Injection insulation; covered the holes.

27,68 €
RE0050

Plastering cement mortar base, mestrejat.

Training facades and interior walls, a base layer of 15 mm thick for coating continuous double layer with batter evened mortar cement gray, made of cement, selected aggregates and additives, finishing swirls, impervious to the rainwater. Manually applied on a surface of ceramic brick, concrete block or brick or block thermoclay. Even proportion of surface preparation support, placing fiberglass mesh for reinforcement antiàlcalis meetings between different materials in the fronts of forged 20% of the surface of furniture, training together corners, teachers, edges, teeth, jambs, lintels, finishes in encounters with walls, paneling or other receipts on its surface.

18,79 €
RE0049

Plastering base with cement mortar good view.

Training facades and interior walls, a base layer of 15 mm thick for coating continuous double layer with plaster to good sight cement mortar, gray, made of cement, selected aggregates and additives, finishing swirls, waterproof the rainwater. Manually applied on a surface of ceramic brick, concrete block or brick or block thermoclay. Even proportion of surface preparation support, placing fiberglass mesh for reinforcement antiàlcalis meetings between different materials in the fronts of forged 20% of the surface of furniture, training together corners, teachers, edges, teeth, jambs, lintels, finishes in encounters with walls, paneling or other receipts on its surface.

13,41 €
RE0228m

Ventilation exhaust duct forced local PVC-tube 125.

Install vent for extracting stale air inside bathroom and / or toilet premises by arrangement, fixed roof wrought-PVC pipe 125 mm, T-piece bypass pipe joint 125 and aluminum -125 flexible Espiroflex to the extractor unit forced even opening gap going on exterior and white lacquered aluminum 25x24 grid outside. Fully installed and wiring.

25,21 €
RE0137m

Sewn static cracks in ceramic brick walls.

Sewn static crack on brick ceramic staple by including corrugated steel B 500 S 10 mm in diameter and 30 cm long, 30 cm each placed crossing across the fissure, comprising: opening boxes ( as racing) perpendicular to the direction of the crack; cleaned, wet and abeurada of them, received staples in boxes with cement mortar and sand lightly added lime dosing 1: 0.5: 4, that there is no excessive shrinkage, placing staples and filling boxes to the level of the household and the fissure already sewn thixotropic repair mortar injection pressure control.

29,22 €
RE0040

Demolition of factory coated interior partition, 4/5/7 cm thick.

Demolition of factory coated interior partition, consisting of simple hollow brick from 4 to 7 cm thick, with manual means, without affecting the stability of the adjacent building elements. Even demolition proportion of its coatings (plaster, mortar, tiles, etc.), carpentry and recessed installations, following the dismantling of the leaves; cleaning, gathering, removal and manual loading debris truck or container.

5,26 €
RE0042

Demolition of interior partition factory coated, solid brick 5 cm panderete.

Demolition of factory coated interior partition, formed by a massive brick panderete 5 cm thick, with manual means, without affecting the stability of the adjacent building elements. Even demolition proportion of its coatings (plaster, mortar, tiles, etc.), carpentry and recessed installations, following the dismantling of the leaves; cleaning, gathering, removal and manual loading debris truck or container.

6,76 €
RE0041

Demolition of interior partition factory coated, perforated brick 11 cm thick.

Demolition of factory coated interior partition, formed by perforated brick thickness of 11-12 cm, with manual means, without affecting the stability of the adjacent building elements. Even demolition proportion of its coatings (plaster, mortar, tiles, etc.), carpentry and recessed installations, following the dismantling of the leaves; cleaning, gathering, removal and manual loading debris truck or container.

9,32 €
RE0072

Factory fitted solid wall for hoop attached.

Embedded profiled wall made of brick, with jackhammer with a thickness less than the total width of the wall, for hosting hoops or related conduct, not including shoes made even removal of debris and loading truck or container, excluding transport to landfill, according NTE / ADD-13.

144,72 €
RE0086

Tiling BALDOSA Catalan, cantilevered forged.

Supply and implementation of pavement cantilever crane by thick layer method with Catalan tiles of 12x24 cm, received with cement mortar M-5 3 cm thick, moistened and dusted surface, grouting with cement grout a minimum board even stakeout proportional cuts, training together and socket, removing excess material and final cleaning.

24,87 €
RE0591

Septum rain, maximum thickness 65 mm with corrugated bituminous

Running partition maximum rainfall of 65 mm thick, consisting of corrugated bituminous type Onducober or similar arrangement with overlapping plates and utensils directly fixed to the key gaps and perimeter shots veneer lacquered with insulation installed the inside of the sealing means for rigid extruded polystyrene panel, according to UNE-EN 13164, 50 mm thick, thermal resistance 0,79 m²K / W thermal conductivity 0.039 W / (mK), 200 kPa compressive strength factor of resistance to diffusion of water vapor and 150 specific heat 1400 J / KGK. Even proportional cuts the insulation.

26,90 €
RE0235m

Escopidora limestone 10x2 cm, with washes.

Training Escopidora Capri limestone or similar 110 to 150 cm in length, 8 to 10 cm wide and 2 cm thick, with washes, face straight edge and polished with clear and embedded during the jambs, covering ledges, overhangs parameters, cornices cranes, etc., received with cement mortar waterproof M-10. Even w / w of preparation and adjustment of the support with waterproof cement mortar M-10, sealing joints between pieces and the walls with mortar joints especially for natural stone coverings.

16,08 €
RE0220

Factory armed concrete block 40x20x10, resistance R10.

Leaf 10 cm thick exterior factory closure in front, hollow concrete block, to coat, gray, 40x20x10 cm, normalized resistance R10 (10 N / mm²), armed with armor kicks MURFOR galvanized , RND.4 / Z or similar, 4 mm diameter, 80 mm wide, type truss with cavalcaments proportion of hooks and lintels and corners, received with cement mortar M-7.5, with support at least 2 / 3 parts of the block on forged or rolled steel angle hot galvanized attached to the fronts of wrought if, runtime errors, the block does not support their 2/3 on forged armor and armed with MURFOR kicks galvanized, RND.4 / Z or similar, 4 mm diameter, 80 mm wide, type truss, placed in rows about 50 cm each and at least start on the factory wrought under washes and on charger holes with an amount of 1 kg / m² and connection devices, ajes anchors, nails and metal fasteners for securing or retaining factory structural elements. Even proportion of tied, losses, damages meeting with pillars, forming corners, parapets roof, forming lintels with pieces adjoins armor and macissat concrete jambs and teeth, expansion joints, running meetings and points unique.

48,54 €
RE0091

Front panel dual-blade profiled sheet steel with insulation in between.

Closing double leaf facade, exterior panel made of sheet steel S320 GD profiled ribbed galvanized 0.6 mm thick and 30 mm height of ridge insulation blanket glass wool hygroscopic not covered by one of its faces a veil of reinforced glass, according to UNE-EN 13162, 60 mm thick tray tray support inside ribbed galvanized steel sheet of 0.6 mm thickness, even proportion of cavalcaments, wastage and accessories hidden fastening and sealing elements and other work necessary for the formation of gaps, joints, corners, shots and meetings with other materials. Fully assembled, with removal of excess material and container cargo.

44,54 €
RE0230

Inner leaf closing crane with LH-7 + PE-40 insulation.

Training leaf interior partition of 7 cm thick factory, ceramic hollow brick double to cover, 33x16x7 cm, received with cement mortar M-5 and internal insulation polystyrene plates of 40 mm expansive type III. thick, even w / w of reconsideration, leveling and plumbing, walls and buildings receipt basis, losses, damages linked, heads and cleaning

29,89 €
RE0102u

Rental tubular scaffold cranes 30 days. Surface 250 m².

Rent for 30 days, standard tubular scaffold, multidirectional type, up to 10 m maximum working consisting of tubular hot galvanized steel, 48.3 mm in diameter and 3.2 mm thick, without duplication of vertical elements, consisting of work platforms 60 cm wide, arranged every 2 meters in height with hatch staircase railing rear skirting and two bars, and front railing with a bar; for the execution of 250 m² facade, considered a front surface of the product resulting from the screening plant perimeter more out of the front to the maximum height of the scaffolding work. Even proportion of flexible network type mosquito monofilament, polyethylene 100% ..

695,25 €
RE0101u

Assembling and dismantling scaffolding tubular facade, 250m².

Assembling and dismantling scaffolding tubular standardized, multi-type, up to 10 m maximum working consisting of tubular hot galvanized steel, vertical elements without duplication of work platforms and 60 cm wide; for execution of 250 m² facade, according to assembly drawings, considering a maximum distance of 20 m from the discharge point of the material and the farthest point of the assembly. Even proportional part of dismantling and assembling flexible network type mosquito monofilament, 100% polyethylene, accessories protection systems, anchors and replacements. Assembly, dismantling and rent for the first month.

1.996,88 €
RE0129

Wall factory load half foot thick.

Bearing wall, 1/2 foot thick factory perforated ceramic brick (honeycomb) to cover, 24x12x9 cm, received with cement mortar M-5, including scaffolding and auxiliary to a maximum height 3 m, removal of debris, cleaning and cargo container.

28,91 €
RE0263

LH-brick partition sheet 7, closing of gaps interns

Partition of a sheet of ceramic hollow brick of 7 cm thick, made with pieces of detached cm 24x11,5x7 singing and received with cement mortar M-5, together with 1 cm thick, uncoated, including rethinking everything, leveling and poise, proportion of tied losses and ruptures, moistened parts and cleaning, taking a 3% profit and a 30% shrinkage mortar according to NBE-FL-90-NTE PTL.

12,71 €
RE0048

Partition inner coating for ceramic brick factory LH-11.

Training leaf partition inside half foot thick factory of ceramic brick empty room, to cover, 33x16x11 cm, received with cement mortar M-5. Even proportion of reconsideration, leveling and plumbing, walls and buildings receipt basis, losses, damages linked, heads and cleaning.

20,95 €
RE0047

Partition inner coating for ceramic brick factory LH7.

Training leaf interior partition of 7 cm thick factory, ceramic hollow brick double to cover, 33x16x7 cm, received with cement mortar M-5. Even proportion of reconsideration, leveling and plumbing, walls and buildings receipt basis, losses, damages linked, heads and cleaning.

23,11 €
RE0087

Perforated face brick pieces / cm 2 plaque.

Perforated surface facing bricks damaged in exterior walls, and drain them in a thickness of 2 cm, for subsequent placement instead of ceramic plates, including removal of debris and burden on container for transport to landfill authorized.

11,26 €
RE0108

Acrylic plastic paint on exterior walls. Facades.

Coating of facades with decorative plastic paint for the realization of the topcoat continuous double layer coatings; cleaning and scrubbing prior mortar support industrial background and hand finishing both hands (yield: 0.1 l / m² each hand), as well as treatment for the presence of mold or moisture at 10% of its surface.

9,96 €
RE0164u

Editorial Study Waste Management rehabilitation cranes (10 IU)

Writing Study Waste Management for the works described in the implementation plan of rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

552,58 €
RE0501u

Repair of emplafonat guard,

Repair emplafonat guard, the windows of the facade, according to two solutions specified in the plans nº 7 and 8. The solution to be adopted in work according to the directions in D.F. It will take care of the cleaning-deoxidize under standard SIS 055900, finished Sa2½ pasivizador and treatment of metal parts in existing L. Protection gliceroftálico final nail color to define the D.F. The finish shall treatments specified vertical surface crane Rep.b).

RE0002

Silicate paint coating exterior

Decorative coating facade paint silicate, for the realization of the topcoat coatings continuous double layer; cleaning and scrubbing prior support in good condition, thanks to funds with a potassium silicate prepared with both hands and acrylic emulsions and finishing (yield: 0.167 l / m² each hand).

11,10 €
RE0090

ROCKWOOL system of direct trasdoses of gypsum plasterboard with insulation incorporated in facade closings.

Direct cladding on interior partition, made with laminated plasterboard - | (10 + 30) (LR) Labelrock 406 110 | ROCKWOOL with rock wool insulation of 30 mm thick, joined the board, received with paste bonding material on the vertical surface; 55 mm thickness, even proportional reconsideration of the finish line of kitchenware, the passageways and hollow; placing successively for each plate, the pasta paletades union support in the household; cutting boards, placing wedges at the bottom and placing individual plates by pressure on paletades; formation of expansion joints; treatment of passageways and holes; execution of angles; treatment together with paste and tape together; received boxes for electrical mechanisms and accommodation facilities step, following reconsideration of its location in the plates and punching them, and final cleaning. Fully finished and ready to emprimar, painting or coating.

29,05 €
RE0121

System Thermocal DBBLOK thermal insulation of facades and mineral coating.

Rehabilitation energy front, using thermal and mineral coating of facades for its outer face with Thermocal DBBLOK system, consisting of a layer of mortar plastered thermal and acoustic insulation, Thermocal, 20 mm thick, applied by projection mechanical performance of 15 kg / m², and a layer of lime mortar monolayer, Ibercal 450 Thermo Master, finished swirls, color to choose, 10 mm thick.

32,07 €
RE0103u

Transport and withdrawal of tubular scaffolding facade. 250 m².

Transport and withdrawal of tubular scaffold standard, multi-type, up to 10 m maximum working consisting of tubular hot galvanized steel, vertical elements without duplication of work platforms and 60 cm wide; for execution of facade of 250 m².

498,57 €