Soleres

CodeUDESCRIPTIONPRICE
RE0012

Compacting with vibrant pending on medium plants

Superficial compaction of soils made with vibrant picó self-supporting 300/600 kg, for accommodation of soleras and mushrooms, in average terrain, with a degree of compaction of up to 90% of normal procorist.

5,54 €
RE0070

Demolition Solera de Concrete en Massa, thickness 10 cm.

Demolition of continuous pavement of concrete in mass of 10 cm thick, with pneumatic hammer, without including the demolition of the base support or deteriorate the constructive elements contiguous. Even proportional part of cleaning, gathering, removal and cargo manual of rubble on truck or container, without including transport to the landfill, according to NTE / ADD-13.

9,42 €
RE0046

Demolition Solera Concrete, thickness 10/12 cm.

Demolition of continuous mass concrete pavement of 10 cm thick, with compressor pneumatic hammer, without including the demolition of the base support or deteriorate the contiguous constructive elements. Even proportional part of cleaning, gathering, removal and manual cargo of rubble on truck or container.

17,26 €
RE0013

Reduction of open-air ground, manually, thickness 0.40 m, in hard terrain

Breaking soil manual for accommodation of soleras and mushrooms, with a thickness of 0.40 m, in hard terrain, even chopped and disassembled with loose foundations, removal of land and loading on truck for subsequent transport to landfill.

33,18 €
RE0224

Solera de Concrete en mass T1, thickness 10 cm, finished bearing.

Training continuous concrete pavement in mass of 10 cm thick, made with concrete HM-20 / F / 12 / and manufactured in central and poured with pump; Treaty superficially with tread mortar, light gray color, composed of cement, selected aggregates of quartz, organic pigments and additives, with an approximate performance of 3 kg / m², manually sprinkled over the still fresh concrete and subsequent application of colorless curing liquid , performance 0.15 kg / m². Even P / P cleaning surface support, extended and vibrated from the concrete through vibrant rule, embroplement or connection of the outer elements (hoops of boxes, boneres, siphonic boxes, etc.) of the installation networks Running executed under the pavement, mechanical swirling of the entire surface until it becomes the mortar totally integrated into concrete, and final cleaning of the finished surface. Including the preparation of the existing base layer, joints of work and concrete, retraction through mechanical media cut with diamond disk at least 2/3 of the thickness of the solera, dilatation joints and together perimeter.

33,39 €
RE0038

Solera reinforced concrete of 12 cm, in lift pit.

Training of continuous pavement of reinforced concrete of 12 cm thick, made with concrete HA-25 / B / 20 / III manufactured in Central, carried out in work, and Electrosoldada ME ME 20x20 Ø 5-5 B 500 T 6x2.20 UNE- In 10080, on approved separators; By elevator fossa bottom, even proportional part of the surface cleaning, extended and vibrated concrete.

53,92 €
RE0015u

Inspection tasting in foundation.

Tasting 80 cm deep, for foundation inspection, which includes the demolition of the pavement, the solera and excavation of the ground with manual and mechanical means and manual load for subsequent filling, extended and compacted with owners.

315,32 €