SOLER

CODEUDESCRIPTIONPRICE
RE0012

Compaction with vibrating tamper soils means

Surface soil compaction manual vibrating roller made with tamper-standing 300/600 kg, screeds and for hosting emmacats on land resources, with a degree of compaction to 90% proctor normal.

5,54 €
RE0070

Demolition mass concrete slab, 10 cm thick.

Demolition of continuous mass concrete pavement 10 cm thick, with jackhammer, not including the demolition of the support base or damage the adjacent building elements. Even proportion of cleaning, gathering, removal and manual loading debris truck or container, excluding transport to the landfill, according NTE / ADD-13.

7,70 €
RE0046

Demolition concrete slab, thickness 10/12 cm.

Demolition of continuous mass concrete pavement 10 cm thick, with jackhammer compressor, not including the demolition of the support base or damage the adjacent building elements. Even proportion of cleaning, gathering, removal and manual loading debris truck or container.

23,89 €
RE0013

Lowering of ground open manually, 00:40 m thick, on hard

Manual lowering soil for accommodation and emmacats screeds with a thickness of 0.40 m, on hard, even crushed and dismantled the foundations of loose aside and loading truck for further transport to landfill.

33,18 €
RE0224

Solera T1 mass concrete, 10 cm thick, finished bearing.

Training continuous mass concrete pavement 10 cm thick, made of concrete HM-20 / M / 12 / I made in central and poured bomb; treated superficially mortar rolling, light gray, made of cement, selected aggregates quartz, organic pigments and additives with a yield approximately 3 kg / m², sprinkled manually on the concrete still fresh and subsequent application of liquid curing colorless , yield 0.15 kg / m². Even w / w cleaning surface support extended by rule and vibrated concrete vibrant embroquetat or connection of external elements (walls of boxes, Boner, sifòniques boxes, etc.) networking facilities executed under the pavement, mechanical swirling across the surface to get the mortar to be fully integrated into the concrete and final cleaning of the finished surface. Including the preparation of the base layer existing job boards and concrete, using mechanical retraction cut diamond blade at least 2/3 the thickness of the slab, expansion joints and perimeter together.

33,39 €
RE0038

Armed concrete slab 12 cm in pit lift.

Formation of continuous reinforced concrete pavement 10 cm thick, made of concrete HA-25 / B / 20 / IIa made central to the work done and mesh 20x20 Ø 5-5 ME B 500 T UNE 6x2,20 EN 10080, approved on separators; funds pit lift even proportion of the surface cleaning medium, extended and vibrated concrete.

53,92 €
RE0015u

Tasting inspection basis.

Tasting 80cm deep foundation for inspection, which includes the demolition of paving, hearth and excavation of the ground with manual means and mechanical and manual loading for subsequent filling, spread and compacted in their own land.

315,32 €