Scaffolding

CODEUDESCRIPTIONPRICE
RE0572%

Shares of control work for the reception of products

Shares of control and minimum work necessary for the reception of products in accordance with the provisions of article 6.1.2 and Appendix 1 of the Technical Building Code (CTE) approved by Royal Decree 314/2006 March 17, replacing standard or even drafting the corresponding work plan the contractor, who must provide the material and human resources to participate in the work and the sequence of conducting parts or stages of work and time specified in the plan. Even palette helps support the work carried out by organizations or external control laboratories.

1,03 €
RE0434u

Occupational Safety and Health Coordination Building renovation (1 UI)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

457,47 €
RE0435u

Health and Safety Coordination in building rehabilitation (10 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

690,89 €
RE0436u

Health and Safety Coordination in building rehabilitation (20 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

796,62 €
RE0437u

Health and Safety Coordination in building rehabilitation (50 IU)

Health and Safety Coordination according to the Health and Safety Study prepared for the works described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

1.002,11 €
RE0456u

Study of Health and Safety at removing barriers (one elevator)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with one elevator or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

299,89 €
RE0457u

Study of Health and Safety at removing barriers (two lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building with two elevators or local, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

381,87 €
RE0458u

Study of Health and Safety at removing barriers (3 lifts)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with three lifts, according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

415,82 €
RE0459u

Study of Health and Safety at removing barriers (4 elevators)

Drafting the Study of Safety and Health for the work described in the implementation plan for the elimination of architectural barriers in a building or premises with 4 lifts, in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

441,89 €
RE0421u

Study of Safety and Health Rehabilitation (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

268,39 €
RE0422u

Study on Safety and Health in rehabilitation (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

349,45 €
RE0423u

Study on Safety and Health in rehabilitation (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

386,16 €
RE0424u

Study on Safety and Health in rehabilitation (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

457,51 €
RE0102u

Rental tubular scaffold cranes 30 days. Surface 250 m².

Rent for 30 days, standard tubular scaffold, multidirectional type, up to 10 m maximum working consisting of tubular hot galvanized steel, 48.3 mm in diameter and 3.2 mm thick, without duplication of vertical elements, consisting of work platforms 60 cm wide, arranged every 2 meters in height with hatch staircase railing rear skirting and two bars, and front railing with a bar; for the execution of 250 m² facade, considered a front surface of the product resulting from the screening plant perimeter more out of the front to the maximum height of the scaffolding work. Even proportion of flexible network type mosquito monofilament, polyethylene 100% ..

695,25 €
RE0039m

Objects fall protection canopy for protection of sidewalk. With rent for one month.

Supply, installation and dismantling canopy of fall protection items, consisting of tubular frames to force galvanized metal sections or modules, training underpass for pedestrians, stringers, visor and tilted 30 degrees to one projection, 50 m, metal plates placed transversely than crystallized and fixed frames, resting on leveling screws and motherboard even signaling the work area

32,04 €
RE0369%

Measures on waste management in work

Measures in the field of waste management to be adopted by the contractor of the works so that they can carry out their obligations in this field, facilitating their development under control coordinators Waste Management during execution the work, according to the studies and plans relating to the Royal Decree 105/2008 of 1 February, which regulates the production and management of construction and demolition waste.

1,55 €
RE0134%

Measures for safety and health at work

Measures on safety and health adopted by the contractor of the works so that they can carry out their obligations in the field of health and safety professionals, facilitating their development under the control of security coordinator and health during the execution of the work, according to the studies and plans and corresponding Royal Decree 1627/97 of 24 October even writing health and safety plan.

2,58 €
RE0261m

Assembling and dismantling scaffolding hanging in courtyard

Assembled and disassembled scaffold hanging in front of 25 ml to rise even higher balances installation, maintenance, lower tray of protection, security systems and transportation.

174,40 €
RE0260m

Assembling and dismantling scaffolding hanging in exterior.

Assembled and disassembled scaffold hanging in front of 25 ml to rise even higher balances installation, maintenance, lower tray of protection, security systems and transportation.

51,60 €
RE0356

Assembling and dismantling scaffolding hanging standardized

Assembling and dismantling scaffolding hung counterweighted standardized, fully recognized and legalized in compliance with the standard safety and health of construction, from the general flat roof of the building, consisting of 250x60 cm work platform, railing, fishing counterweight 500 kg / ea, pulleys for lifting and descent brake device guide, steel cables, hooks and gauze. In remote areas will be made by means of vertical separation with a harness attached workers using safety equipment approved by the EEC, trays large network parachute and installation of the relevant networks and / or vertical mesh protection microfiber material type; unit completely installed and security measures tested and verified according to current regulations.

8,59 €
RE0101u

Assembling and dismantling scaffolding tubular facade, 250m².

Assembling and dismantling scaffolding tubular standardized, multi-type, up to 10 m maximum working consisting of tubular hot galvanized steel, vertical elements without duplication of work platforms and 60 cm wide; for execution of 250 m² facade, according to assembly drawings, considering a maximum distance of 20 m from the discharge point of the material and the farthest point of the assembly. Even proportional part of dismantling and assembling flexible network type mosquito monofilament, 100% polyethylene, accessories protection systems, anchors and replacements. Assembly, dismantling and rent for the first month.

1.996,88 €
RE0103u

Transport and withdrawal of tubular scaffolding facade. 250 m².

Transport and withdrawal of tubular scaffold standard, multi-type, up to 10 m maximum working consisting of tubular hot galvanized steel, vertical elements without duplication of work platforms and 60 cm wide; for execution of facade of 250 m².

498,57 €
RE0188u

Further work on the health and safety coordinator

Further work on the health and safety coordinator, who will coordinate the activities of the work to ensure that contractors and, where applicable, subcontractors and freelancers apply consistently and responsibly preventive action described in Study on Safety and Health in the corresponding Plan. Includes travel.

68,88 €