Scaffold

CodeUDescriptionPrice
RE0572%

Control actions in work for the reception of products

Minimum and necessary control actions in work for the reception of products in accordance with the provisions of article 6.1.2 and in Annex 1 of the Technical Building Code (CTE) approved by Royal Decree 314/2006 , of March 17, or norm that replaces it, even drafting of the corresponding plan of work of the contractor, who will have to foresee the material and human resources that will participate in the work and the sequence of realization of Parts or phases of work, as well as the times planned in planning. Even support palette support for work executed by entities or laboratories of external control.

1,03 €
RE0434u

Coordination safety and health in rehabilitation building (1 UI)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or premises with intervention in 1 inspection unit, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

560,47 €
RE0435u

Coordination safety and health in rehabilitation building (10 UI)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 10 units of inspection, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

793,89 €
RE0436u

Coordination safety and health in rehabilitation building (20 UI)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 20 inspection units, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

899,62 €
RE0437u

Coordination safety and health in rehabilitation building (50 UI)

Coordination of health and safety according to the safety and health study drafted for the works described in the project for the execution of rehabilitation for a building or local with intervention in 50 units of inspection, in accordance with what s' It establishes in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

1.105,11 €
RE0602u

Safety and health study in new construction building (1 UI)

Drafting of the health and safety study for works described in the project of execution in construction of new construction for a building or local with intervention in 1 inspection unit, in accordance with what is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

571,35 €
RE0421u

Study of security and health in rehabilitation (1 UI)

Drafting of the health and safety study for works described in the project for the execution of rehabilitation for a building or local with intervention in 1 inspection unit, in accordance with what is established in the Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

458,77 €
RE0422u

Rehabilitation safety and health study (10 UI)

Drafting of the health and safety study for the works described in the project for the execution of rehabilitation for a building or premises with intervention in 10 units of inspection, in accordance with what is established in the Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

566,04 €
RE0423u

Safety and health study in rehabilitation (20 UI)

Drafting of the health and safety study for the works described in the project for the execution of rehabilitation for a building or local with intervention in 20 inspection units, in accordance with what is established in the Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

614,63 €
RE0424u

Safety and health study in rehabilitation (50 UI)

Drafting of the health and safety study for the works described in the project for the execution of rehabilitation for a building or local with intervention in 50 inspection units, in accordance with what is established in the Royal Decree 1627 / 97, of October 24, of the Ministry of Presidency.

709,06 €
RE0102u

Bastida rental of façade 30 days. Surface 250 m².

Rent, for 30 calendar days, standardized tubular scaffolding, multidirectional type, up to 10 m high height of work, formed by hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm of thickness, without duplicity of vertical elements, composed of work platforms of 60 cm wide, arranged every 2 m in height, interior scale with trap, rear railing with two bars and environments, and front railing with a bar; For the execution of facade of 250 m², considering as an area of ​​facade, the resulting of the product of the plant projection of the perimeter more out of the facade due to the maximum work height of the scaffolding. Even proportional part of flexible network, monofilament mosquito net, 100% polyethylene ..

695,25 €
RE0039m

Marquesa of anti-food protective objects for the protection of the sidewalk. With rent for 1 month.

Supply, assembly and dismantling of anti-sealing protection of objects, formats for tubular structure based on frames or modules of galvanized metal profiles, lower passing training, inclined visor and inclined at 30 ° and cantilever 1.50 m , metallic plates of transversal classification and fixed to frames, supported in leveling screws and motherboard, including signaling of the work area

32,04 €
RE0369%

Measures in the field of waste management in work

Measures in the field of waste management to be adopted by the contracting company of the works so that it can carry out its obligations in this field, facilitating its development under the control of the coordinator in the field of waste management during L 'Execution of the work, in accordance with the corresponding studies and plans and with Royal Decree 105/2008, of February 1, which regulates the production and management of construction and demolition waste.

1,55 €
RE0134%

Measures in the field of safety and health in work

Measures in the field of health and safety to be adopted by the contracting company of the works so that it can carry out its obligations in the field of the prevention of professional risks, facilitating its development under the control of the coordinator in matters of health and health during the execution of the work, in accordance with the corresponding studies and plans and with Royal Decree 1627/97 of October 24, even drafting of Safety and Health Plan.

2,58 €
RE0261m

Assembly and disassembly Bastida hanging, in the interior courtyard

Mounted and disassembled with scaffolding hanging on a height of 25 ml, even installation with superior counterweights, maintenance, lower protection tray, security and transport systems.

174,40 €
RE0260m

Assembly and disassembly of hung scaffolding, on exterior facade.

Mounted and disassembled with scaffolding hanging on a height of 25 ml, even installation with superior counterweights, maintenance, lower protection tray, security and transport systems.

51,60 €
RE0356

Assembly and disassembly of standardized hanging scaffolding

Assembly and disassembly of standardized counterbalanced scaffolding, totally approved and legalized in compliance with the standard of security and health of the construction, from the general flat roof of the building, composed of a work platform of 250x60 cm, rail, fishing counterweight 500 kg / ud, elevation and descent pulleys and device, guide, steel cables, hooks and gases. In difficult access areas, it will be carried out through vertical disengagement techniques, with harness-related operators using EEC approved security equipment, large parachute network trays, and installing the corresponding networks and / or vertical protection meshes, in microfiber type material; Unit totally installed and with the proven and verified security measures according to current regulations.

8,59 €
RE0101u

Assembly and disassembly of coat of facade tubular, 250m².

Mounting and disassembly of standardized tubular scaffolding, multidirectional type, up to 10 m high working height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; For facade execution of 250 m², according to mounting plans, considering a maximum distance of 20 m between the download point of the materials and the point further away from the assembly. Even proportional part of assembly and dismantling of flexible network, mosquito net type monofilament, 100% polyethylene, accessories, protection systems, anchors and replacements. Assembly, dismantling and rent for the first month.

1.996,88 €
RE0456u

Drafting of health and safety study in elimination of barriers (1 elevators)

Drafting of the health and safety study for the works described in the project of execution for the elimination of architectural barriers in a building or place, consisting of the deletion of the unevenness of access through descent to level 0 of 1 Elevators, ramp or other solutions, in accordance with what is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

263,21 €
RE0458u

Drafting of health and safety study in elimination of barriers (1 elevators)

Drafting of the health and safety study for works described in the project of execution for the elimination of architectural barriers in a building or local, consisting of the installation of 1 elevators, in accordance with what It is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

526,43 €
RE0457u

Drafting of health and safety study in elimination of barriers (2 elevators)

Drafting of the health and safety study for works described in the project for the execution for the elimination of architectural barriers in a building or local, consisting of the deletion of the unevenness of access through descent to level 0 of 2 Elevators, ramp or other solutions, in accordance with what is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

326,05 €
RE0459u

Drafting of health and safety study in elimination of barriers (2 elevators)

Drafting of the health and safety study for works described in the project of execution for the elimination of architectural barriers in a building or local, consisting of the installation of 2 elevators, in accordance with what It is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

652,10 €
RE0103u

Transport and withdrawal of tubular tubular scaffolding. 250 m².

Transport and withdrawal of standardized tubular scaffolding, multidirectional type, up to 10 m high working height, formed by hot galvanized steel tubular structure, without duplicity of vertical elements and work platforms of 60 cm wide; For facade execution of 250 m².

498,57 €
RE0188u

Visit to the work of the Safety and Health Coordinator, even displacement

Visit to the work of the Safety and Health Coordinator, which will have to coordinate the activities of the work to ensure that the contractors and, where appropriate, the subcontractors and the autonomous workers apply in a coherent and responsible way the preventive action described in L 'Security and health study and in the corresponding plan. Includes displacement.

68,88 €