Prices validated by Joaquim Iborra Posadas

CodeUDESCRIPTIONPRICE
RE0652u

Actions in the work phase of external control of energy certification (1 UI)

Supervision and external control of the energy efficiency certification, in the execution phase of work, for checking a building finished with 1 inspection unit, in accordance with the recognized document DRD 06/15 «Criteria Technicians for external control of the energy efficiency certification of newly built buildings », consisting of the programming of external control, registration of the promoter's compliance with this programming previously at the beginning of the work, external control During the course of the execution of the work, the identification of the final data of work (DFO), the detection of deviations regarding the documents and the issuance of the external control report, including, in Case of deviations, the calculation of the qualification using the same option of calculation. Includes: journeys and visits.

409,53 €
RE0658u

Actions in the work phase of external energy certification (10 UI)

Supervision and external control of the certification of energy efficiency, in the execution phase of work, for checking a building finished with 10 inspection units, in accordance with the recognized document DRD 06/15 «Criteria Technicians for external control of the energy efficiency certification of newly built buildings », consisting of the programming of external control, registration of the promoter's compliance with this programming previously at the beginning of the work, external control During the course of the execution of the work, the identification of the final data of work (DFO), the detection of deviations regarding the documents and the issuance of the external control report, including, in Case of deviations, the calculation of the qualification using the same option of calculation. Includes: journeys and visits.

1.218,51 €
RE0659u

Actions in the work phase of external energy certification (20 UI)

Supervision and external control of the certification of energy efficiency, in the execution phase of work, for checking a building finished with 20 inspection units, in accordance with the recognized DROD DRD 06/15 «Criteria Technicians for external control of the energy efficiency certification of newly built buildings », consisting of the programming of external control, registration of the promoter's compliance with this programming previously at the beginning of the work, external control During the course of the execution of the work, the identification of the final data of work (DFO), the detection of deviations regarding the documents and the issuance of the external control report, including, in Case of deviations, the calculation of the qualification using the same option of calculation. Includes: journeys and visits.

1.584,93 €
RE0660u

Actions in the work of external control of energy certification (50 UI)

Supervision and external control of the certification of energy efficiency, in the execution phase of work, for checking a building finished with 50 inspection units, in accordance with the recognized document DRD 06/15 «Criteria Technicians for external control of the energy efficiency certification of newly built buildings », consisting of the programming of external control, registration of the promoter's compliance with this programming previously at the beginning of the work, external control During the course of the execution of the work, the identification of the final data of work (DFO), the detection of deviations regarding the documents and the issuance of the external control report, including, in Case of deviations, the calculation of the qualification using the same option of calculation. Includes: journeys and visits.

2.297,15 €
RE0651u

Previous actions for external energy certification (1 UI)

Supervision and external control of the certification of energy efficiency, in phase of previous actions, for the verification of the technical documentation of a building project with 1 inspection unit, in accordance with the recognized document DRD 06 / 15 «Technical criteria for external control of the energy efficiency certification of newly built buildings», consisting of identifying the data contained in the files of the calculation option used for the energy certification of the project , Checking your coherence with the project for the execution or minimum documentation, the preparation of the previous report of external control, where the particularized control data of control (DIC) will be registered in an attached document called initial data identification Control Particularized for the building, in addition to the conclusions on the qualification of energy efficiency and, finally, the compliance registration of the promoter with the particularized documents.

202,89 €
RE0655u

PREVIOUS ACTIONS OF EXTERNAL ENERGY CERTIFICATION (10 UI)

Supervision and external control of the certification of energy efficiency, in phase of previous actions, for the verification of the technical documentation of a building project with 10 inspection units, in accordance with the recognized document DRD 06 / 15 «Technical criteria for external control of the energy efficiency certification of newly built buildings», consisting of identifying the data contained in the files of the calculation option used for the energy certification of the project , Checking your coherence with the project for the execution or minimum documentation, the preparation of the previous report of external control, where the particularized control data of control (DIC) will be registered in an attached document called initial data identification Control Particularized for the building, in addition to the conclusions on the qualification of energy efficiency and, finally, the compliance registration of the promoter with the particularized documents.

805,23 €
RE0656u

PREVIOUS ACTIONS OF EXTERNAL ENERGY CERTIFICATION (20 UI)

Supervision and external control of the certification of energy efficiency, in phase of previous actions, for the verification of the technical documentation of a building project with 20 inspection units, in accordance with the recognized document DRD 06 / 15 «Technical criteria for external control of the energy efficiency certification of newly built buildings», consisting of identifying the data contained in the files of the calculation option used for the energy certification of the project , Checking your coherence with the project for the execution or minimum documentation, the preparation of the previous report of external control, where the particularized control data of control (DIC) will be registered in an attached document called initial data identification Control Particularized for the building, in addition to the conclusions on the qualification of energy efficiency and, finally, the compliance registration of the promoter with the particularized documents.

1.078,05 €
RE0657u

PREVIOUS ACTIONS OF EXTERNAL ENERGY CERTIFICATION (50 UI)

Supervision and external control of the certification of energy efficiency, in phase of previous actions, for the verification of the technical documentation of a building project with 50 units of inspection, in accordance with the recognized document DRD 06 / 15 «Technical criteria for external control of the energy efficiency certification of newly built buildings», consisting of identifying the data contained in the files of the calculation option used for the energy certification of the project , Checking your coherence with the project for the execution or minimum documentation, the preparation of the previous report of external control, where the particularized control data of control (DIC) will be registered in an attached document called initial data identification Control Particularized for the building, in addition to the conclusions on the qualification of energy efficiency and, finally, the compliance registration of the promoter with the particularized documents.

1.608,35 €
RE0157u

Technical advice in a judicial procedure

Technical advice on the preparation of documentation of a judicial procedure for submission of a demand, or in questions to carry out another or similar perit, in which the perth only intervenes as an advisor and not directly in the procedure, even visits and displacement.

232,26 €
RE0155u

Appearance of a Perit against Magistrate

Appearance of a perept in judicial body, as a result of a judicial citation, in the presence of magistrate or its representative (in oral view or in situ recognition), to answer questions or make clarifications, even waiting time and visits and displacement.

194,88 €
RE0154u

Appearance of a perit in public body

Appearance of an expert in public body (judicial organizations or administration, professional colleges, etc.) for the consultation or collection of documentation and information or various management, even visits and displacement.

138,18 €
RE0275u

Dedication of a technician in each scope of application of current regulations

Dedication of a technician to study and compliance with each scope of current regulations.

92,40 €
RE0279u

Dedication of a technician to constructive solution design

Dedication of a technician to the design of constructive solutions, consisting of the study and assessment of existing needs and solutions.

100,80 €
RE0177u

Dedication of a technician to elaborate graphic documentation in a section

Dedication of a technician to the elaboration of the graphic documentation of a section, section or annex of a technical document.

85,60 €
RE0273u

Dedication of a certificate issuance technician

Dedication of a technician to the issuance of technical certificate for various purposes, understood as a document that ensures the truth of a fact and / or circumstances related to building and / or soil.

46,20 €
RE0278u

Dedication of a technician to the uprising of current state

Dedication of a technician to the uprising of the current state of a building or local.

80,93 €
RE0178u

Dedication of a technician to the taking of data or current status in an inspection unit, without displacement

Dedication of a technician to fieldwork, such as data taken or current state uprising in an inspection unit in building or local. Does not include displacement.

10,81 €
RE0175u

Dedication of a technician in the drafting of section, section or annex of specific specifications

Dedication of a technician in the writing of a section, section or annex of the specifications of a technical document.

66,31 €
RE0556u

Dedication of a technician in the writing of previous report, justification, of incidence, control or in accordance

Dedication of a technician in the writing of a previous report, justification, of incidence, control or in accordance, attached or not to a certificate or other Serverative document.

46,20 €
RE0555u

Dedication of a technician to the review and analysis of a technical document

Dedication of a technician to the review and analysis of a technical document (section of memory, group of plans, fold, order book, study and security plan, urban planning document, report, opinion, laboratory study, Budget and measurement, valuation, etc.).

46,20 €
RE0280u

Dedication of a technician to the supervision and layout of the documentation

Dedication of a technician to the supervision and layout of the documentation, consisting of supervising and modeling the generated documentation taking into account the demands of both professional colleges and of the administrations where they are presented.

69,30 €
RE0174u

Dedication of a technician in Drafting of Section, Section or Annex of Memory

Dedication of a technician in the writing of a section, section or annex of the memory of a technical document.

87,92 €
RE0176u

Dedication of a Technician in Drafting of Section, Section or Annex of Budget

Dedication of a technician in the writing of a section, section or annex of the measurement and budget of a technical document.

87,92 €
RE0274u

Dedication of a technician in Drafting of Needs Program

Dedication of a technician in the drafting of the program of needs, consisting of the study and evaluation of the existing needs and approach of solutions.

100,80 €
RE0169u

Dedication of a technician at a work meeting, even displacement

Dedication of a technician at a work meeting. Includes displacement.

68,88 €
RE0277u

Dedication of a technician to the design of interior architecture

Dedication of a technician to the design of interior architecture, a process through which the interior of the buildings is designed, worrying for all aspects of human use of spaces and therefore includes the design of Interior and the eventual decoration.

201,60 €
RE0159u

Dedication of a technician to the ocular recognition of an inspection unit in building or local, without displacement

Dedication of a technician to the ocular recognition of an inspection unit in building or local. Does not include displacement.

11,55 €
RE0271u

Dedication of a technician to the Telematic Registry of Documentation

Dedication of a technician to the telematic registry of technical or administrative documentation.

23,10 €
RE0272u

Dedication of personnel to the administrative management of a file

Dedication of administrative personnel to the general management of the documentation of a file.

18,08 €
RE0433u

Personnel dedication to administrative management in an external entity, even displacement

Dedication of administrative personnel to administrative management in an external entity. Includes displacement.

58,84 €
RE0276u

Dedication of specialist technician to inspection, calculation or expert structure

Dedication of a specialist technician to inspection, calculation or expertise of a structural element.

126,00 €
RE0153u

Displacement of a technician (distance in intervals of 10 km or fraction)

Displacement of a technician to a property located at a computed distance at intervals of 10 km or fraction, considering round trip.

11,34 €
RE0603u

Waste management study in new construction building (1 UI)

Drafting of the waste management study for works described in the project for executing new construction building for a building or local with intervention in 1 inspection unit, in accordance with what is established in the Real Decree 105/2008, of February 1, 2008, of the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

544,25 €
RE0602u

Security and Safety Study in New Construction Building (1 UI)

Drafting of the health and safety study for works described in the project for executing new construction for a building or local with intervention in 1 inspection unit, in accordance with what is established in Royal Decree 1627/97, ​​of October 24, of the Ministry of Presidency.

571,35 €
RE0420u

Documentation management or technical or administrative consultation

Management and processing of technical or administrative documentation in a local, autonomous or state administrative entity, consisting of the processing of the necessary documentation for the application for license, permission, authorization, etc., interlocution with the technicians of the entity and final resolution. Includes: visits and displacement.

118,10 €
RE0180u

Drafting of Waste Management Study in Facade Rehabilitation (1 UI)

Drafting of the Waste Management Study for Works Described in the Facade Rehabilitation Execution Project with Intervention in 1 Inspection Unit, in accordance with what is established in Royal Decree 105/2008, From February 1, 2008, from the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

479,46 €
RE0164u

Writing Waste Management Study in Rehabilitation of Façade (10 UI)

Drafting of the Waste Management Study for the works described in the Facade Rehabilitation Execution Project with intervention in 10 inspection units, in accordance with what is established in Royal Decree 105/2008, From February 1, 2008, from the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

552,58 €
RE0199u

Drafting of Waste Management Study in Rehabilitation of Façade (20 UI)

Drafting of the Waste Management Study for the works described in the Facade Rehabilitation Execution Project with intervention in 20 inspection units, in accordance with what is established in Royal Decree 105/2008, From February 1, 2008, from the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

598,35 €
RE0200u

Drafting of Waste Management Study in Rehabilitation of Façade (50 UI)

Drafting of the waste management study for works described in the project for the execution of restaurant rehabilitation with intervention in 50 units of inspection, in accordance with what is established in Royal Decree 105/2008, From February 1, 2008, from the Ministry of Presidency, which regulates the production and management of construction and demolition waste.

711,69 €
RE0170u

Drafting of complementary report of IEC building (1 UI)

Drafting of complementary building of building (IEC), of 1 inspection unit, which collects the information from the written and graphic building with the aim of detecting, identifying and qualifying damages (fissures, cracks, humidity. ..) In constructive elements, both structural and in those that can indicate symptoms of damage in the structure, such as the façade, covers, partitions, carpentry and finishes. Includes: Displacement and visit of the technicians for complementary inspection of the structure of the properties, sufficiently detailed to obtain the necessary parameters for the structural evaluation, the drafting of a cove plan, the study of the results obtained and L 'Estimation of the index of corrosion damage and risk (IC) and the structural index (IE) and the drafting of the complementary report, based on the Inspection Guide and complementary evaluation of structures of building hormigon Existing, recognized document DRB 05/09 Decree 132/2006 of the Council.

1.148,75 €
RE0413u

Drafting of complementary report of IEC building (10 UI)

Drafting of complementary building report (IEC), of a building or local with 10 inspection units, which collects the information from the written and graphic building with the aim of detecting, identifying and qualifying damages (fissures , cracks, humidity ...) in constructive elements, both structural and those that may indicate symptoms of damage in the structure, such as on the façade, covers, partitions, carpentry and finishes. Includes: Displacement and visit of the technicians for complementary inspection of the structure of the properties, sufficiently detailed to obtain the necessary parameters for the structural evaluation (with an intensity of minimum inspection of 10 inspection units), the drafting Of a cove plan, the study of the results obtained and the estimation of the index of corrosion damage and risk (IC) and the structural index (IE) and the drafting of the complementary report, based on In the Guide for Inspection and Complementary Evaluation of structures of existing building hormigon, recognized document DRB 05/09 Decree 132/2006 of the Council.

2.084,14 €
RE0414u

Drafting of complementary report of IEC building (14 UI)

Drafting of complementary building report (IEC), of a building or local with 14 inspection units, which collects the information from the written and graphic building with the aim of detecting, identifying and qualifying damages (fissures , cracks, humidity ...) in constructive elements, both structural and those that may indicate symptoms of damage in the structure, such as on the façade, covers, partitions, carpentry and finishes. Includes: Displacement and visit of the technicians for complementary inspection of the structure of the properties, sufficiently detailed to obtain the necessary parameters for the structural evaluation (with an intensity of minimum inspection of 14 inspection units), the writing Of a cove plan, the study of the results obtained and the estimation of the index of corrosion damage and risk (IC) and the structural index (IE) and the drafting of the complementary report, based on In the Guide for Inspection and Complementary Evaluation of structures of existing building hormigon, recognized document DRB 05/09 Decree 132/2006 of the Council.

2.324,45 €
RE0415u

Drafting of complementary report of IEC building (50 UI)

Drafting of complementary building of building (IEC), of a building or local with 50 inspection units, which collects the information from the written and graphic building with the aim of detecting, identifying and qualifying damages (fissures , cracks, humidity ...) in constructive elements, both structural and those that may indicate symptoms of damage in the structure, such as on the façade, covers, partitions, carpentry and finishes. Includes: Displacement and visit of the technicians for complementary inspection of the structure of the properties, sufficiently detailed to obtain the necessary parameters for the structural evaluation (with an intensity of inspection minimum of 30 inspection units), the writing Of a cove plan, the study of the results obtained and the estimation of the index of corrosion damage and risk (IC) and the structural index (IE) and the drafting of the complementary report, based on In the Guide for Inspection and Complementary Evaluation of structures of existing building hormigon, recognized document DRB 05/09 Decree 132/2006 of the Council.

3.546,37 €
RE0163u

Education of evaluation report of the IEEV.CV building (1 UI)

Drafting of evaluation report of the building for residential residential use of the Valencian Community (IEEV.CV), of 1 inspection unit, which describes the constructive characteristics of the common elements of an existing building, Indicating its state of conservation, its conditions of accessibility and energy efficiency, and indicating the constructive, functional, security or habitability deficiencies detected, in order to warn about these and guide the necessary actions to keep The proper state of conservation of the building, as well as to improve its accessibility and energy efficiency. Includes: displacement and visit of the technician for ocular inspection of the property Inspection units), elaboration of the report and its registration in the corresponding registry, preparation of the Energy Efficiency Certificate and its registration in the corresponding registry and obtaining the accreditation tag.

622,85 €
RE0410u

Editorial Evaluation Report of the IEEV.CV building (10 UI)

Drafting of evaluation report of the building of residential use of housing of the Valencian Community (IEEV.CV), of a building or local with 10 inspection units, which describes the constructive characteristics of the common elements d 'An existing building, indicating its state of conservation, its conditions for accessibility and energy efficiency, and indicating the constructive, functional, security or habitability deficiencies, in order to warn about these and guide them Actions needed to maintain the proper state of conservation of the building, as well as to improve its accessibility and energy efficiency. Includes: displacement and visit of the technician for ocular inspection of the property (with an intensity of minimum inspection of 6 inspection units), preparation of the report and its registration in the corresponding registry, preparation of the certificate of Energy efficiency and its registration in the corresponding registry and obtaining the accreditation tag.

1.043,11 €
RE0411u

Editorial Evaluation Report of the IEEV.CV building (20 UI)

Drafting of evaluation report of the Residential Residential Use Building of the Valencian Community (IEEV.CV), of a building or local with 20 inspection units, which describes the constructive characteristics of the common elements d 'An existing building, indicating its state of conservation, its conditions for accessibility and energy efficiency, and indicating the constructive, functional, security or habitability deficiencies, in order to warn about these and guide them Actions needed to maintain the proper state of conservation of the building, as well as to improve its accessibility and energy efficiency. Includes: displacement and visit of the technician for ocular inspection of the property (with an intensity of inspection minimum of 10 inspection units), preparation of the report and its registration in the corresponding registry, preparation of the certificate of Energy efficiency and its registration in the corresponding registry and obtaining the accreditation tag.

1.260,94 €
RE0412u

Editorial Evaluation Report of the IEEV.CV building (50 UI)

Drafting of evaluation report of the building of residential use of housing of the Valencian Community (IEEV.CV), of a building or local with 50 inspection units, which describes the constructive characteristics of the common elements d 'An existing building, indicating its state of conservation, its conditions for accessibility and energy efficiency, and indicating the constructive, functional, security or habitability deficiencies, in order to warn about these and guide them Actions needed to maintain the proper state of conservation of the building, as well as to improve its accessibility and energy efficiency. Includes: displacement and visit of the technician for ocular inspection of the property (with an intensity of inspection minimum of 16 inspection units), preparation of the report and its registration in the corresponding registry, preparation of the certificate of Energy efficiency and its registration in the corresponding registry and obtaining the accreditation tag.

1.678,13 €
RE0516u

Drafting of preliminary evaluation report of IEP structure (1 UI)

Drafting of report for the preliminary inspection and evaluation of the structure of concrete (IEP) of 1 inspection unit, which collects the information of the written and graphic building with the aim of analyzing the current state Of the structure of the building, the presence of injuries or damages in the main or secondary structure and the presence of deterioration factors in concrete and establishes the recommendations on the actions to be done. Includes: Visit of the Technician for Inspection of the Property.

557,14 €
RE0517u

Drafting of preliminary evaluation report of IEP structure (10 UI)

Drafting report for the inspection and preliminary assessment of the concrete structure (IEP) of a building or local with 10 units of inspection, which collects the information from the written and graphic building with the objective of Analyze the current state of the structure of the building, the presence of injuries or damages in the main or secondary structure and the presence of deterioration factors in concrete and establishes the recommendations on the actions to be done. Includes: Technician Visit for Property Inspection (with an intensity of minimum inspection of 6 inspection units).

890,80 €
RE0518u

Drafting of preliminary evaluation report of IEP structure (20 UI)

Drafting of report for the inspection and preliminary evaluation of the concrete structure (IEP) of a building or local with 20 inspection units, which collects the information from the written and graphic building with the objective of Analyze the current state of the structure of the building, the presence of injuries or damages in the main or secondary structure and the presence of deterioration factors in concrete and establishes the recommendations on the actions to be done. Includes: Visit of the Technician for Inspection of the Property (with an intensity of minimum inspection of 15 units of inspection).

1.127,15 €
RE0538u

Drafting of preliminary evaluation report of IEP structure (50 UI)

Drafting of report for the preliminary inspection and evaluation of the concrete structure (IEP) of a building or local with 50 units of inspection, which collects the information from the written and graphic building with the objective of Analyze the current state of the structure of the building, the presence of injuries or damages in the main or secondary structure and the presence of deterioration factors in concrete and establishes the recommendations on the actions to be done. Includes: Visit of the Technician for Inspection of the Property (with an intensity of minimum inspection of 23 inspection units).

1.491,20 €
RE0158u

Drafting of report and opinion

Drafting of report and opinion, consisting of the written exposure of the circumstances observed in the recognition of predisos, buildings, documents, etc., or in the examination of the question that is considered, with technical explanations, economic, etc. ., And with the opinion on the question subject to consideration and justified based on the report.

630,00 €
RE0160u

Drafting of report and opinion (1 ui)

Drafting of report and opinion for 1 inspection unit, consisting of the written exposition of the circumstances observed in the recognition of the property, with technical, economic explanations, etc., and with the opinion on the question subjected to consideration and justified based on the report. Includes: visits and displacement and visit of the expert for inspection of the property.

758,31 €
RE0165u

Energy Certification Drafting (10 UI)

Energy certification drafting for a building or local with 10 inspection units, in accordance with the provisions of Royal Decree 235/2013 of April 5, which approves the basic procedure for the certification of L 'Energy efficiency of buildings. Includes: Visit of the certificate technician for inspection inspection (with an intensity of minimum inspection of 6 inspection units, elaboration of the certificate, registration in the registration and obtaining of the energy efficiency tag.

500,58 €
RE0166u

Energy Certification Drafting (20 UI)

Energy certification drafting for a building or local with 20 inspection units, in accordance with the provisions of Royal Decree 235/2013 of April 5, which approves the basic procedure for the certification of L 'Energy efficiency of buildings. Includes: Visit of the certificate technician for the property inspection (with an intensity of minimum inspection of 10 units of inspection, preparation of the certificate, registration in the registry and obtaining the energy efficiency tag.

657,08 €
RE0167u

Energy Certification Drafting (50 UI)

Energy certification drafting for a building or local with 50 units of inspection, in accordance with the provisions of Royal Decree 235/2013 of April 5, which approves the basic procedure for the certification of L 'Energy efficiency of buildings. Includes: Visit of the certificate technician for the inspection of the property (with an intensity of minimum inspection of 16 units of inspection, elaboration of the certificate, registration in the registry and obtaining the energy efficiency tag.

955,08 €
RE0601u

Drafting of construction project for new construction (1 UI)

Drafting of construction project for new construction (basic project and project of execution) for 1 inspection unit, consisting of study and solution of needs program, analysis of urban planning regulations, memory writing, annexes, certification issuance Energy, budget and measurement, specifications and plans. Includes: visits and displacement.

9.339,44 €
RE0499u

Visit to the work of the Waste Management Coordinator, even displacement

Visit to the work of the Waste Management Coordinator, which will have to coordinate the activities of the work to ensure that contractors and, where appropriate, subcontractors and self-employed workers applied in a coherent and responsible way to management described in the study of waste management. Includes displacement.

68,88 €
RE0188u

Visit to the work of the Safety and Health Coordinator, even displacement

Visit to the work of the Safety and Health Coordinator, which will have to coordinate the activities of the work to ensure that the contractors and, where appropriate, the subcontractors and the autonomous workers apply in a coherent and responsible way the preventive action described in L 'Security and health study and in the corresponding plan. Includes displacement.

68,88 €
RE0187u

Visit to the director of execution, even displacement

Visit to the work of the execution director, which is part of the facultative management, directs the material execution of the work, and controlled qualitatively and quantitatively the executed construction. Includes displacement.

68,88 €
RE0186u

Visit the work director, even displacement

Visit to the work director, which is part of the Faculty Directorate, directs the development of the work in the technical, aesthetic, urban and environmental aspects, in accordance with the project that defines it, the building license and other mandatory authorizations and contract conditions. Includes displacement.

68,88 €
RE0156u

Visit of recognition, data jack, eye inspection or face-to-face intervention, even displacement

Visit of recognition, data taken or ocular inspection of installations, constructions, injuries, coves, lands, plots, urbanization works, etc., or any other intervention on the part of a technician. Includes: displacement and, if applicable, descriptive minutes emission.