Prices validated by Maigualida Soler Hawk

CODEUDESCRIPTIONPRICE
RE0122u

Aids palette for the implementation of coves (20 IU)

Aid for the replacement pallet bays executed in a building with 20 units of inspection, involving the replacement of siding and paint on the affected area, size no greater than 0,50x0,50 m, without providing materials 'finished. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or unique siding replacement.

600,48 €
RE0157u

Technical advice on legal proceedings

Technical advice in the preparation of documentation of legal proceedings by filing a complaint, or ask to make another expert or similar, which involved only the expert as a consultant and not directly in the procedure, including visits and travel.

148,68 €
RE0553u

Technical assistance for the execution of a campaign of inlets (50 IU)

Technical assistance for the execution of a campaign of beaches in a building or premises involving 50 inspection units, consisting of planning, coordination and supervision of the implementation of the coves and laboratory aids work for his replacement. Includes visits and travel.

416,43 €
RE0297u

Calculation and sizing of a structure (10 UI)

Calculation and sizing of a structure of wood, steel, concrete or mixed, including its foundation for a building with 10 units or local inspection, consisting of the sizing and verification of structural elements defined in a project execution, from the calculation of solicitations, stresses and deformations resulting from the implementation of the actions planned for use and the corresponding regulations. Includes tours and travel, floor plans, sections and details of the cutting structure, memory calculations, measurements and consulting. Not including the design of the structure, geotechnical or management or technical assistance in the implementation phase.

2.127,18 €
RE0155u

Appearance before a magistrate expert

Appearance of an expert on judicial body as a result of a subpoena in the presence of a magistrate or his representative (in hearing recognition or in situ) to answer questions or clarifications, including waiting time and visits and displacement.

148,68 €
RE0154u

Appearance of an expert body in public

Appearance of an expert on public body (judicial or administrative bodies, professional associations, etc.) to query or collect information or documents and various procedures, including visits and travel.

91,98 €
RE0196u

Study of Safety and Health Rehabilitation cranes (10 IU)

Drafting the Study of Safety and Health for the work described in the project implementation involving 10 units of inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October , the Ministry of the Presidency.

333,51 €
RE0197u

Study of Safety and Health Rehabilitation cranes (20 IU)

Drafting the Study of Safety and Health for the work described in the project implementation involving 20 units of inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October , the Ministry of the Presidency.

363,01 €
RE0198u

Study of Safety and Health Rehabilitation cranes (50 IU)

Drafting the Study of Safety and Health for the work described in the project implementation involving 50 units of inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October , the Ministry of the Presidency.

420,34 €
RE0179u

Study of Safety and Health Rehabilitation front of a house

Drafting the Study of Safety and Health for the work described in the project implementation involving the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October , the Ministry of the Presidency.

268,39 €
RE0421u

Study of Safety and Health Rehabilitation (1 UI)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention in the first inspection unit in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

268,39 €
RE0422u

Study on Safety and Health in rehabilitation (10 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 10 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

349,45 €
RE0423u

Study on Safety and Health in rehabilitation (20 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan of rehabilitation for a building or local intervention 20 inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

386,16 €
RE0424u

Study on Safety and Health in rehabilitation (50 IU)

Drafting the Study of Safety and Health for the work described in the implementation plan for building rehabilitation or intervention in 50 local inspection units, according to the provisions of Royal Decree 1627 / 97 of 24 October, the Ministry of the Presidency.

457,51 €
RE0533u

Implementation plan coves and tests in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building:

9.942,89 €
RE0534u

Implementation plan coves and tests in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 8 units of inspection for each inspection area of ​​the building:

9.942,89 €
RE0535u

Implementation plan coves and tests in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom hormigón using existing structures in buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the opinion of the technical editor. As guidance and prior evaluation, consider the following jobs to run, according to a quantified value estimated average equivalent to 16 units of inspection for each inspection area of ​​the building:

13.257,50 €
RE0420u

Management of administrative documents and technical consultation

Management and processing of documents in an administrative entity local, regional or national level, involving the processing of the necessary documentation for the application license, permit, authorization, etc., communication with the entity's technical and final resolution . Includes visits and travel.

136,54 €
RE0300u

Management application and registration, communication, analysis, etc. an administrative entity

Management and registration application, communication or request an administrative entity similar local, regional or national level, consisting of a single submission of the required documentation. Includes visits and travel.

63,86 €
RE0281u

Interior electrical installation for single family

Electrical installation inside a family house, consisting of general command and protection panel for single family, consisting of cash recessed insulating material opaque door for hosting power control switch (ICP) (not included in this price) in separate compartment and sealed and the following devices: first switch device (IGA) cutting omnipolar, three circuit breakers 40 a, two breakers breakers 10 a, two breakers breakers 16 a, 1 breaker 25 a circuit breaker for protection of these internal circuits (not included in the price): 1 lighting circuit, the first circuit sockets, one circuit for air conditioning, emergency lighting circuit 1, the first circuit closing automated.

2.898,05 €
RE0298u

Modeling the behavior of a structure (10 UI)

Modeling the behavior of a structure of wood, steel, concrete or mixed, including its foundation for a building with 10 units or local inspection, consisting of calculating solicitations, stresses and deformations resulting from the implementation of the actions planned for use and the corresponding regulations, based on data from a previous campaign to determine geometry, running creeks and laboratory testing, and verification of safety factors derived from this analysis. Includes tours and travel, visit calculista for technical inspection of the property (with an intensity of inspection least six inspection units), memory calculation and graphic support, conclusions and recommendations. Not including the definition, where appropriate, strengthening and maintenance of the structure, which will subject the corresponding implementation plan, or management or technical assistance in the implementation phase.

2.265,78 €
RE0170u

Writing Supplementary Report of building (1 UI)

Writing supplementary report Building (IEC) of the first inspection unit, which collects the information of the building written and graphic in order to detect, identify and qualify the damages (fissures, cracks, humidities. ..) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain necessary parameters for evaluating structural drafting a plan coves of the study results and the estimating the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based on the Guidelines for the Inspection and Evaluation complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

950,54 €
RE0413u

Writing supplementary report building IEC (10 IU)

Writing supplementary report Building (IEC), a building with 10 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 10 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

1.794,16 €
RE0414u

Writing supplementary report building IEC (20 IU)

Writing supplementary report Building (IEC), a building with 20 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 20 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

2.313,11 €
RE0415u

Writing supplementary report building IEC (50 IU)

Writing supplementary report Building (IEC), a building with 50 units or local inspection, which collects information from written and graphic building in order to detect, identify and describe the damage (cracks , cracks, moisture ...) in building materials, structural and those other symptoms that may indicate damage to the structure, such as the facade, roofs, partitions, joinery and finishes. Includes travel and visit of the technical inspection of the structure of additional properties, sufficiently detailed to obtain the necessary parameters for the structural assessment (with a minimum intensity of inspection 30 inspection units), writing a plan coves of the study results and the estimation of the damage index and Corrosion Risk (CI) and the Structural index (EI) and the writing of the supplementary report, based the Inspection and Evaluation Guide for the complementary structures of buildings hormigón existing document recognized DRB Decree 132/2006 05/09 Council.

3.126,46 €
RE0163u

Writing assessment report building (1 UI)

Writing Assessment Report of buildings (IEE) of the first inspection unit, which collects information on the building and its evaluation regarding their condition, according to the conditions of accessibility regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property, making the certificate, entry in the register and obtain the energy efficiency label.

453,11 €
RE0410u

Writing assessment report building IEE (10 IU)

Writing Assessment Report of buildings (IEE), a building with 10 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

820,24 €
RE0411u

Writing assessment report building IEE (20 IU)

Writing Assessment Report of buildings (IEE), a building with 20 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.034,04 €
RE0412u

Writing assessment report building IEE (50 IU)

Writing Assessment Report of buildings (IEE), a building with 50 units or local inspection, which collects information on the building and its evaluation regarding his condition, conditions accessibility according to current regulations and the degree of energy efficiency. Includes tours and travel, and visit the technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.422,92 €
RE0158u

Writing report and opinion

Editorial and opinion report, consisting of the following written statement of the circumstances observed in recognition estates, buildings, documents, etc., or the consideration of the issue is considered, with explanations of technical, economic, etc. ., and the opinion on the subject matter under consideration and justified on the basis of the report.

630,00 €
RE0160u

Writing report and opinion (1 UI)

Writing report and opinion for the first inspection unit, consisting of the following written statement of the circumstances observed in recognition of the property, with technical explanations, economic, etc., and the opinion on the issue subject to consideration and justified on the basis of the report. Includes visits and travel and tour expert for the inspection of the property.

719,04 €
RE0151u

Editorial energy certification (1 UI)

Editorial energy certification for the first inspection unit in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for certifying the energy efficiency of buildings . Includes tours and travel, visit certifier for technical inspection of the property, making the certificate, entry in the register and obtain the energy efficiency label.

174,52 €
RE0165u

Editorial energy certification (10 IU)

Editorial energy certification for a building with 10 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes tours and travel, visit certifier for technical inspection of the property (with an intensity of inspection least six units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

489,43 €
RE0166u

Editorial energy certification (20 IU)

Editorial energy certification for a building with 20 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes tours and travel, visit certifier for technical inspection of the property (with a minimum intensity of inspection of 10 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

679,57 €
RE0167u

Writing certification energetics (50 IU)

Editorial energy certification for a building with 50 units or local inspection in accordance with the provisions of Royal Decree 235/2013 of 5 April, approving the basic procedure for the certification of energy efficiency of buildings. Includes tours and travel, visit certifier for technical inspection of the property (with a minimum intensity of inspection of 16 units of inspection, certification preparation, entry in the register and obtain the energy efficiency label .

1.022,47 €
RE0516u

Writing the evaluation report preliminary structure IEP (1 UI)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP) of the first inspection unit, which collects information from written and graphic building with the aim of analyzing the state current structure of the building, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes tours and travel, and visit the technical inspection of the property.

522,49 €
RE0517u

Writing the evaluation report preliminary structure IEP (10 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 10 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes tours and travel, and visit the technical inspection of the property (with an intensity of inspection least six inspection units).

913,90 €
RE0518u

Writing the evaluation report preliminary structure IEP (20 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 20 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes tours and travel, and visit the technical inspection of the property (with an intensity of at least 15 inspection inspection units).

1.254,20 €
RE0538u

Writing the evaluation report preliminary structure IEP (50 IU)

Writing for the inspection report and preliminary assessment of the concrete structure (IEP), a building with 50 units or local inspection, which collects information from written and graphic building with the aim of analyze the current state of the building structure, the presence of injuries or damage to the main structure or the presence of secondary factors of deterioration in concrete and provides recommendations on actions to take. Includes tours and travel, and visit the technical inspection of the property (with a minimum intensity of inspection 23 inspection units).

1.710,65 €
RE0286u

Writing project execution installation of electricity (20 IU)

Writing project execution installation of electricity for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and electrotechnical Regulation for low voltage REBT (RD 842/2002). Includes tours and travel, memory document specification, budget and plans.

894,99 €
RE0288u

Writing project execution plumbing and sanitation (20 IU)

Writing project execution plumbing and sanitation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes tours and travel, memory document specification, budget and plans.

547,75 €
RE0289u

Writing project execution gas installation (20 IU)

Writing project execution gas installation for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes tours and travel, memory document specification, budget and plans.

825,54 €
RE0290u

Writing project execution install fire protection (20 IU)

Writing project execution install fire protection for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes tours and travel, memory document specification, budget and plans.

455,14 €
RE0287u

Writing project execution installation of telecommunications services (20 IU)

Writing project execution installation of telecommunications services for a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and the Rules governing the common telecommunications infrastructure for access to telecommunication services inside buildings (Royal Decree 346/2011). Includes tours and travel, memory document specification, budget and plans.

779,23 €
RE0291u

Writing project development and implementation of urban regeneration (20 IU)

Writing project development and implementation of urban regeneration to an area linked to a building or local intervention 20 inspection units, according to the provisions in the Technical Building Code CTE (RD 314/2006) and specific regulations. Includes tours and travel, memory document specification, budget and plans.

1.127,95 €
RE0285u

Writing project to install thermal energy (20 IU)

Writing project execution installation of thermal energy for a building or local intervention 20 inspection units, according to the provisions of the Technical Building Code CTE ( RD 314/2006) and the Regulation of Thermal Installations in Buildings RITE (RD 1027/2007). Includes tours and travel, memory document specification, budget and plans.

1.010,73 €
RE0173u

Drafting building rehabilitation project (1 UI)

Writing implementation plan for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and approach of the work aimed at repairing pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans.

3.129,77 €
RE0171u

Drafting building rehabilitation project (10 IU)

Writing implementation plan for a building with 10 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 10 IU).

5.514,99 €
RE0172u

Drafting building rehabilitation project (20 IU)

Writing implementation plan for a building with 20 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 20 IU).

6.745,18 €
RE0168u

Drafting building rehabilitation project (50 IU)

Writing implementation plan for a building with 50 units or local inspection, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and the approach work aimed at repairing the pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans (with an intensity of inspection least 30 IU).

8.922,39 €
RE0185u

Writing rehabilitation project cranes (1 UI)

Writing implementation plan for the first inspection unit. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

708,52 €
RE0190u

Writing rehabilitation project cranes (10 IU)

Writing implementation plan for the rehabilitation of a facade with 10 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

886,47 €
RE0191u

Writing rehabilitation project cranes (20 IU)

Writing implementation plan for the rehabilitation of a facade with 20 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

967,06 €
RE0192u

Writing rehabilitation project cranes (50 IU)

Writing implementation plan for the rehabilitation of a facade with 50 units in operation inspection. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the facade. Includes tours and travel, visit the technical inspection of the facade memory document specification, budget, annex install scaffolding, and all necessary plans in order to put into action the works.

1.128,28 €
RE0189u

Writing project studies and project management and rehabilitation cranes (1 UI)

Writing project studies and project management for the renovation and facade of a house. Consisting of technical visits for data collection, the current uprising, study and evaluation of existing conditions and planning work aimed at the restoration of the façade restoration project drafting, drafting Annex scaffolding writing study health and safety, preparation of study on waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes visits and travel.

1.281,60 €
RE0152u

Renovation of municipal license of occupation of a dwelling

Renovation of municipal license of occupation of a property, according to municipal regulations. Includes visit to the house of the technical issue of technical certificate of compliance with the conditions of habitability, processing the affidavit of renewal and application fees, and obtaining the certificate of occupancy.

262,45 €
RE0161u

Review and analysis of technical documentation

Review and analysis of technical documentation (reports, opinions, laboratory studies, measurements and budgets, assessments, reports, plans, specifications, order books, studies and safety plans, structural calculations, planning documents, etc. ) with a medium level of complexity.

126,00 €
RE0182u

Appraisal or property valuation building or premises (1 UI)

Appraisal and real estate valuation for the first inspection unit, consisting of the writing assessment report and supporting, independent or complementary to another report or opinion. Includes tours and travel, visit expert for inspection of the property, market research, analysis of current legislation on the date of valuation, preparation of graphic documentation necessary assessment and report writing.

261,69 €
RE0162u

Economic valuation report or opinion for

Economic valuation justified repair diseases, deficiencies amendment, etc., as an inseparable part of an expert opinion, which complements. Considering a maximum of six items valued with or without decomposition.

157,50 €